Laserfiche WebLink
EXHIBIT A <br />Scope of Services <br />413048-2-56-01 <br />The utility work to be performed under this agreement consists of relocation of existing Indian River <br />County utility facilities impacted by construction to include the following items: <br />Summary of Quantities <br />Pay Iteni <br />Number <br />Pay Item Descnp; on <br />Unit <br />Quantiry <br />1050-13-C34 <br />EXISTING UTILITY PIPE (CAP & PRESSURE GROUT) (3". 12" & 16"i <br />LF <br />9543 <br />11015C-13- 005 <br />EX;ST:NG UT€UTY P#PE iCAP & PRESSURE GROUT (24"t <br />LF <br />1377 <br />:105-11-31-236 <br />UTILITY PIPE ('r&3) (PVC) (6") <br />LF <br />113 <br />25G 31-20S <br />UTILITY PIPE (F&I) (FVC) (8") <br />LF <br />162 <br />'1Q53 31 212 <br />UTILITY PIPE (F&') (PVC) (12") <br />LF <br />3323 <br />'1050-31-21E <br />UTILITY PIPE (Fat) (PVC)(16") <br />LF <br />7072 <br />1+355-51.112 <br />LMLITY FITTING (F&t) (ELBOW) iDli (12") <br />EA <br />21 <br />1055-51.116 <br />UTILITY FITTING (F&C) (ELBOVV:i (Df) (16"i <br />EA <br />33 <br />1055-51-203 <br />UTILITY FI -TING (F&?) (TEE: (DI) (3") <br />EA <br />1 <br />1055-51-212 <br />UTILITY F!71NG (F&I) (TEE) (D€) (12") <br />EA <br />I <br />1055-514.21E <br />UTILITY FITTING (F&=j (TEE) (D') (15") <br />EA <br />iO <br />1055-51.312 <br />UTILITY F! —ti (F&I) (REDUCER) (Ds) (8"X12", <br />EA <br />1 <br />1055-51-324 <br />UTILITY FITTING (F&I) (REDUCER: (DI) (16"X24"I <br />EA <br />3 <br />K55.51.50S <br />UTILITY FI7 ING (r-&1) (CAP: (Di) (8"i <br />EA <br />I <br />1055-52-s15 <br />UTILITY FITTING (F&€) (CAP: (Di) (16"14 <br />EA <br />9 <br />1080-11-499 <br />UTiLITY FIXT URE (F&) (TEMPORARY JUNIPER CONNECTION} (16") <br />EA <br />2 <br />1` 20-23-116 <br />UTILITY FIXTURE (F&1)(TAPPING SADDLE/SLEEVE} (16"XIE"I <br />EA <br />3 <br />;1080 2» ivy <br />UTILITY FIXTURE (F&I) (VALVE ASSEPABLY} (6") <br />EA <br />6 <br />1080.24-10'3 <br />UTILITY FIXTURE (F&I) (VALVE ASSEMBLY) (8") <br />EA <br />i <br />e1080-2»-112 <br />UTIL! Y FIXTURE (F&I) (VALVE ASSEt-ABLY) (12") <br />EA. <br />2 <br />10-&G-24- 116 <br />U7:1LITY FIXTURE (F&O:VALVE ASSEMBLY) (16") <br />EA. <br />14 <br />IO&0-27-115 <br />UTILITY F;X URE (F&i) (LINE STOP ASSY) (16") <br />EA <br />3 <br />10,30-27-1-24 <br />UTILITY FIXTURE (-'Vi (LINE STOP ASSY) Q -*'14 <br />EA <br />2 <br />i1083-32-1436 <br />UTILITY FIXTURE (F&!) (SAMPLE POINT) (6") <br />EA <br />5 <br />i10E0-32-108 <br />UTILITY FIXTURE (F&t) (SAMPLE POINT) (8-1 <br />EA <br />1 <br />1 83 32 116 <br />UTIL!TY FlrWE (F&!) (SAIAPLE POINT) (16") <br />EA <br />7 <br />FIRE HYORAtJT (F&:t (3 th'AY) (2 NOSE. 1 PUP:IPE;# (6 j <br />Ems. <br />5 <br />