My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-247B
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-247B
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
12/22/2022 1:07:19 PM
Creation date
12/22/2022 1:04:44 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
12/06/2022
Control Number
2022-247B
Agenda Item Number
8.I.
Entity Name
Tetra Tech, Inc
Subject
CCNA2018 Work Order 12 to provide in the Unincorporated Indian River County Lagoon
Arc GIS Nitrogen Load Estimation Tool (ArcNLET) Model
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Mr. Eric Charest <br />November 8, 2022 <br />Page 2 of 4 <br />Tetra Tech will review the available data and provide input to IRC on any data gaps that could <br />affect the model results. <br />Task 2. Develop ArcNLET Model and Conduct Modeling <br />Using the data gathered in Task 1, Tetra Tech will develop an ArcNLET model that encompasses <br />the entire IRL Basin within unincorporated IRC. The ArcGIS files will be incorporated into the <br />model and the available water quality data will be used to adjust the model parameters. The <br />model will then be run to determine the nitrogen loading impacts from the septic system to the <br />surface waterbodies within IRC. <br />Task 3. Conduct Sensitivity Analysis for Nitrogen Load Estimate <br />Tetra Tech will investigate the sensitivity in the nitrogen load estimates from the ArcNLET <br />model by providing probability density functions of the load estimates. This information will <br />help IRC to understand the minimum, maximum, and average nitrogen load estimates to help <br />with identification of future septic to sewer projects. <br />Task 4. Prepare Draft Report <br />Tetra Tech will prepare a draft report that summarizes the nitrogen loading from septic systems <br />to surface waterbodies for each arealbasin of IRC and include a spreadsheet/database that shows <br />pollutant loading estimates per parcel. The report will also include the results of the sensitivity <br />analysis to help IRC understand the range of loading estimates. The draft report will be provided <br />as a Word document to IRC for review. <br />Task 5. Prepare Final Report <br />Tetra Tech will prepare a final report that incorporates the comments received from IRC on the <br />draft report in Task 4. The final report will be provided to IRC as both a Word document and <br />PDF. <br />Task 6. Communication and Meetings <br />Throughout the project, Tetra Tech will communicate with IRC to ensure the best data are <br />incorporated into the ArcNLET model and to keep IRC updated on the project status. An in- <br />person meeting will be held to review the draft report and model results with IRC to obtain input <br />for the final report. <br />PROJECT SCHEDULE <br />The approximate duration noted for each task is based on our current understanding and best <br />estimates of time required to perform the basic services and may be subject to change upon <br />agreement between IRC and Tetra Tech. <br />Task Timeline <br />Notice to Proceed NTP November 10, 2022 <br />IRC Provides All Data November 18, 2022 <br />TETRA TECH <br />
The URL can be used to link to this page
Your browser does not support the video tag.