Laserfiche WebLink
Alt Form 525-010-6OeA STATE OF FLORIDA DEPARTMENT OF TRANSPORTATION 525 -011 -OA <br />STATE -FUNDED GRANT AGREEMENT PROGRAM MANAGEMENT <br />05/21 <br />EXHIBIT A <br />PROJECT DESCRIPTION AND RESPONSIBILITIES <br />FPN: 431759-2-54-01 <br />This exhibit forms an integral part of the Agreement between the State of Florida, Department of Transportation and <br />Indian River County (the Recipient) <br />PROJECT LOCATION: <br />❑ The project is on the National Highway System. <br />® The project is on the State Highway System. <br />PROJECT LENGTH AND MILE POST LIMITS:.090 miles <br />88060000 28.088 to 28.178 <br />PROJECT DESCRIPTION: Construction for the Project will include, but not be limited to the following: <br />• Roadway reconstruction @ SR -60 & 43rd Ave <br />• Drainage Improvements <br />• Traffic Signal Improvements <br />• Signing and Pavement Markings <br />• Installation of new mast arms <br />• Lighting <br />• Landscaping <br />• ADA upgrades to all curb ramps, sidewalks, and curb and gutters within the Project's limits <br />• Polyurethane injection to fill the voids and stabilize the surrounding soils beneath the roadway surface. <br />The COUNTY shall perform the following services at their sole cost and expense: <br />• Continuation of Professional Engineering Services for the reconstruction of the intersection at SR -60 and 43rd Ave.(Post <br />Design) <br />• Utility work and/or relocation <br />SPECIAL CONSIDERATIONS BY RECIPIENT: <br />The Recipient is required to provide a copy of the design plans for the Department's review and approval to coordinate <br />permitting with the Department, and notify the Department prior to commencement of any right-of-way activities. <br />The Recipient shall commence the project's activities subsequent to the execution of this Agreement and shall perform in <br />accordance with the following schedule: <br />a) Construction to be completed by June 30, 2023 <br />Page 1 of 2 <br />119 <br />