My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/04/2022
CBCC
>
Meetings
>
2020's
>
2022
>
10/04/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2023 4:15:47 PM
Creation date
1/4/2023 4:00:55 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/04/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
244
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Exhibit A <br />DELIVERABLES <br />FM# 431759-2-54-01 <br />ITE MNO. DESCRIPTION <br />UNIT ESTIMATED QTY. <br />711-11-222 (THERMOPLASTIC, STANDARD, YELLOW, SOLID, 18" <br />I LF I 77 <br />-------- --------------------------------------------------r----r--------- <br />711-16-101 (THERMOPLASTIC, STANDARD, WHITE, SOLID, 6" <br />I GM I 3.1 <br />'THERMOPLASTIC, STANDARD - OTHER SURFACES, WHITE, 7 10-30 SKIP OR 3-9 I i <br />(LANE DROP <br />IGM I 3.59 <br />_711-16_-131 <br />---1------------------------------------------------T-----r---------- <br />711-16-201 (THERMOPLASTIC, STANDARD, YELLOW, SOLID, 6" <br />1 1 <br />GM 2.37 <br />---------+--------------------------------------------------I------F---------- <br />[THERMOPLASTIC, STANDARD, YELLOW, SKIP, 6"—_--_—_—_—_—_--_—_—_� GM <br />_711-16-23_1_ <br />715-1-13 (LIGHTING CONDUIT F&I INSULATED NO. 4 <br />—1—_—_—_ 0.44 <br />i LF i 36765 <br />— 715-4-13 — ISTANDA_RD_LIG_HT PO_L_E_C_O_M_PLE_T_E W_!_C_O_N_CR_ETE_- BASE, _F&I_W_IN_D_S_PEE_D_16_0–--EA —I ------- 30_ <br />715-4-33 IICONFLICT LIGHT POLE COMPLETE W/ CONCRETE- BASE, F&I, WIND SPEED 160 1 EA 1 36 <br />715-5-30 ILU_MIN_AIR_E_ AND MOUNTED SIGNAL 1 <br />FEA <br />_ _BRACKET _ARM _O_N__POLE, _&I __ _____4_ <br />— <br />— jLOAD CENTER (INCLUDES ALL COMPONENTS LISTED ON SERVICE POINT DETAILS <br />715-7-11 IDRAWINJ------------------ <br />- _4 ------------------------i--- <br />EA I 3 <br />--f--------- <br />-1 -POLE CABLE DISTRIBUTION SYSTEM CONVENTIONAL—_—_—_—_----_—_ <br />EA 70 <br />—715=500 <br />--------4----------------------------------------------- <br />--_—_—_— <br />--------------- <br />--_—_—__ ICh_aase Order 01 Deliverables <br />MOT <br />I Day I 87 <br />--------Extended <br />--------------—-------- <br />(Extended Erosion Control and Maintenance <br />------- +--------------------------------------------+---t---------- <br />------- <br />I Day I 87 <br />1Extended Indirect Costs and Expenses <br />--------4-------------P--- —------------- <br />I Day I 68 <br />� — --�-------- <br />IRemobilizations TRC <br />---------1----LT--�---------------------I-- <br />I LS I 1 <br />----------- <br />1------ <br />------- Pol rethane Injection Uretek <br />I LB I 24170 <br />----------_-- <br />IPick u Truck (MOT, Vac, &CCNCrews <br />I Hour I 81 <br />IVAC Truck <br />I Day I 9 <br />ICCTV Truck <br />— — -- <br />i Hour i 81 <br />IVAC Truck Operator <br />--------1----- ---------- <br />I Hour I 81 <br />------------a-----1---------- <br />----- (Foreman-LMOT_CCTV_& MOT Crews----- <br />------- <br />—-----�—LS—!-------1 <br />ISkilled Laborer (Vac & CCTV & MOT crews <br />LS 1 <br />--_—_— <br />ICCTV Truck Operator <br />I Hour I 81 <br />CEI CLASSIFICATIONS <br />SR. PROJECT ENGINEER <br />PROJECT ADMINISTRATOR <br />SR. INSPECTOR <br />INSPECTOR <br />INSPECTOR'S AIDE <br />QUALITY CONTROL (QC) MANAGER <br />EARTHWORK CONSTRUCTION INSPECTOR LEVEL 1 <br />EARTHWORK CONSTRUCTION INSPECTOR LEVEL 2 <br />ASPHALT PAVING TECHNICIAN LEVEL 1 <br />ASPHALT PAVING TECHNICIAN LEVEL 2 <br />BRIDGE INSPECTOR 2 <br />BRIDGE INSPECTOR 1 <br />CONTRACT SUPPORT SPECIALIST <br />ASSISTANT PROJECT ADMINISTRATOR <br />124 <br />Page 4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.