My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/11/2022 (2)
CBCC
>
Meetings
>
2020's
>
2022
>
10/11/2022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/4/2023 4:28:14 PM
Creation date
1/4/2023 4:27:40 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Minutes
Meeting Date
10/11/2022
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
15
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Board of County Commissioners Meeting Minutes - Final October 11, 2022 <br />(Right -of -Way) and 2022-078 (Fire Station), cancelling certain taxes upon publicly <br />owned lands, pursuant to Section 196.28, Florida Statutes. The motion carried by <br />the following vote: <br />Aye: 5 - Chairman O'Bryan, Vice Chairman Earman, Commissioner Adams, Commissioner <br />Flescher, and Commissioner Moss <br />8.J. 22-0857 Approval to Piggyback USF Xerox Contract <br />Recommended Action: Staff requests the Board waive the requirement for bids for copiers, printers and <br />multi -functional printers, and authorize staff to piggyback the contract between USF <br />and Xerox. Staff also recommends the Board authorize the Purchasing Manager to <br />sign any required individual leases with Xerox, as appropriate under the agreement, <br />after review by the County Attorney as to form and legal sufficiency. <br />Attachments: Staff Report <br />Xerox MSA ITN 17 -16 -MH - duly signed 061418 - FINAL <br />Xerox Amendment # 1 - SignedUSF <br />Xerox Amendment # 2 - USFSigned <br />Approved staffs recommendation <br />9. CONSTITUTIONAL OFFICERS and GOVERNMENTAL AGENCIES <br />10. PUBLIC ITEMS <br />A. PUBLIC HEARINGS <br />10.A.1. 22-0839 Glendale Baptist Church, Inc.'s Request for Modified Conceptual Site Plan and <br />Special Exception Use Approval for Glendale Baptist Church and School <br />[SP -SE -21-08-19 / 2004040365-89958] (Quasi -Judicial) <br />Recommended action: Staff recommends that the BCC grant modified conceptual site plan approval and <br />special exception use approval for child care services to be added as a use on the <br />site with the following conditions: 1. The final site plan (for each respective project <br />phase) and associated County permits shall include the final design of the <br />following: a. Tree protection and tree mitigation plan; b. Landscape plan; c. Left <br />and right turn lanes at both project driveway connections (27th Avenue and 4th <br />Street); d. Stormwater management system that will accommodate runoff <br />generated by the offsite left and right turn lanes; e. 27th Avenue sidewalk; f. <br />Internal sidewalk/pedestrian system; g. Street lighting plan: and h. Playground <br />area. 2. The maximum student enrollment shall not exceed 400 students. 3. The <br />multi-purpose playfield shall not include outdoor lighting. Any future request to <br />add outdoor lighting to the playfield area will require special exception approval <br />(PZC review and BCC approval). 4. Prior to issuance of a Certificate of <br />Occupancy (C.O.) for Phase 1, the required left and right turn lanes at the <br />driveway connection to 27th Avenue shall be completed. 5. Prior to issuance of a <br />Certificate of Occupancy (C.O.) for Phase 2, the required left and right turn lanes <br />Indian River County Florida page 6 <br />
The URL can be used to link to this page
Your browser does not support the video tag.