My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/18/2022
CBCC
>
Meetings
>
2020's
>
2022
>
10/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2023 11:02:57 AM
Creation date
1/5/2023 10:35:26 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/18/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY, FLORIDA <br />MEMORANDUM <br />TO: Jason E. Brown, County Administrator <br />THROUGH: Richard B. Szpyrka, P.E., Public Works Director <br />James W. Ennis, P.E., Assistant Public Works Director <br />Kirstin Leiendecker, P.E., Roadway Production Manager <br />FROM: Jim Mann, MPA, Infrastructure Project Manager <br />SUBJECT: Amendment to Easement Number 32851 - <br />Trans -Florida Central Railroad Trail (IRC -2115) <br />DATE: October 5, 2022 <br />DESCRIPTION AND CONDITIONS <br />The Public Works Department, alongwith the Board of Trustees of the Internal Improvement <br />Trust Fund of the State of Florida are requesting an amendmentto Easement Number 32851, <br />which would allow for a 1.4 -mile section of paved trail to be built within the St. Sebastian <br />River Preserve State Park and be a direct benefit to the Park. This is the next section of the <br />Trans -Florida Railroad Trail due west of the recently completed pedestrian overpass, that <br />spans Interstate 95. <br />The trail will consist of a 12 -foot -wide asphalt shared -use path that seconds as a natural fire <br />line suitable for heavy safety equipment, three culvert installations that will provide <br />hydrologic connections between surrounding wetlands severed by the construction of the <br />original railroad berm, and installation of collapsible bollards at each end of the easement. <br />The original easement was executed in 2015 and allows for a 50 -year term use unless <br />terminated pursuant to the provisions therein. It allowed for the construction trail west of the <br />North County Park to the city limits of Fellsmere east of Interstate 95. This amendment will <br />include the next trail portion to be constructed west of Interstate 95 in the next section of the <br />St. Sebastian River Preserve State Park. <br />FUNDING <br />The trail will be built within abandoned Trans -Florida Central Railroad Right -of -Way as part of <br />the Rails to Trails Program awarded by the Florida Department of Transportation to Indian <br />River County. Indian River County will enter into a Local Agency Program (LAP) agreement for <br />construction funding of this project. Estimated funding of $174,979 is programmed into the <br />2022 Capital Improvement Plan in account #31521441-066510-21035, Optional Sales <br />Tax/Trans-Florida Rail Trail Greenway Phase II and FDOT funding of $920,210. <br />RECOMMENDATION <br />Staff recommends the Board approve Amendment One to Easement Number 32851 with the <br />Board of Trustees of the Internal Improvement Trust Fund and authorize the Chairman to <br />execute the same. <br />25 <br />
The URL can be used to link to this page
Your browser does not support the video tag.