My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
10/18/2022
CBCC
>
Meetings
>
2020's
>
2022
>
10/18/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2023 11:02:57 AM
Creation date
1/5/2023 10:35:26 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
10/18/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
270
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Consent Item <br />Indian River County, Florida <br />Department of Utility Services <br />Board Memorandum <br />Date: September 30, 2022 <br />To: Jason E. Brown, County Administrator <br />From: Sean C. Lieske, Director of Utility Services <br />Prepared by: Harrison Youngblood, PE, Utilities Engineer, Utility Services <br />Subject: Work Order 9 to Bowman Consulting Group, LTD. <br />Background/Analysis: <br />On February 2, 2021, the Indian River County Board of County Commissioners approved Work Order 3 to <br />Bowman Consulting Group, LTD. (Bowman) for the West Wabasso Phase 3 project, which included the <br />design, permitting, and bidding of the West Wabasso Septic to Sewer Phase 3 project. <br />The Indian River County Department of Utility Services (IRCDUS) desires to continue utilizing Bowman <br />Consulting Group, LTD. (Bowman) under its CCNA 2018 contract, renewed and extended in 2021, for <br />services that will be required on the West Wabasso Septic to Sewer Phase 3 project moving forward. As <br />the project prepares to move into the construction phase, the County has requested that Bowman provide <br />Construction Administration and Certification services to ensure the project is constructed in compliance <br />with the bid documents. All services shall be provided on a time and expense basis for those activities as <br />requested by IRCDUS. Fees will be based on the approved standard hourly rate schedule in the Agreement. <br />Services will be invoiced monthly <br />Funding: <br />Funds in the amount of $75,000.00 for this project are derived from the Impact Fee/West Wabasso <br />Sewer Phase 3 account, number 472-169000-21512. These are Utilities capital funds that are generated <br />from impact fees. Furthermore, growth of the sewer collection system has created the need for the <br />construction, and that growth will benefit from the construction. <br />Description <br />Account Number <br />Amount <br />Impact Fee/West Wabasso Sewer Phase 3 <br />472-169000-21512 <br />$75,000.00 <br />Recommendation: <br />Staff recommends that the Board of County Commissioners approve Work Order 9 for Bowman <br />Consulting Group, LTD., to perform the construction administration and certification for the amount, <br />not to exceed, of $75,000.00, and authorize the Chairman to sign on their behalf. <br />Attachment: <br />Work Order No. 9: Bowman Consulting Group, LTD. <br />Page 1 f <br />
The URL can be used to link to this page
Your browser does not support the video tag.