My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-259
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-259
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2023 1:27:47 PM
Creation date
1/5/2023 1:25:36 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Contract
Approved Date
12/20/2022
Control Number
2022-259
Agenda Item Number
8.G.
Entity Name
GH Vero Beach Development LLC
Subject
Third Modification to Contract for Construction of Final Lift of Asphalt
Contract No. PD-13-10-03-FLA (2001020101-7703)
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
4 Amu aaA„ <br />A TRUE COPY <br />CERTIFICATION ON LAST PAGE <br />J.R. SMITH, CLERK <br />VMASTELLER A MOLER. INC. <br />M -- CIVIL ENGINEERS -r 121512022 <br />RESERVE AT GRAND HARBOR (PHASE 1) <br />CERTIFIED COST ESTIMATE <br />Description <br />Quantity <br />Unit <br />Unit Price <br />TOTAL <br />Mobilization <br />1 <br />LS <br />$3,500.00 <br />$3,500.00 <br />1.25" SP 9.5 - 2nd Lift (Grand Harbor Reserve Sq.) <br />31321 <br />SY <br />$15.00 <br />$49,815.00 <br />Mill Existing Asphalt (1.5") <br />9,579 <br />SY <br />$4.70 <br />$45,021.30 <br />Overlay w/ 1.5" SP 9.5 Asphalt <br />9,579 <br />SY <br />$15.50 <br />$148,474.50 <br />Restripe Pavement <br />1 <br />LS <br />$4,000.00 <br />$4,000.00 <br />Reset PCP's <br />1 <br />LS <br />$3,000.00 <br />$3,000.00 <br />TOTAL <br />$253,810.80 <br />ISurety Amount 025% $317,263.50 <br />CERTIFICATE OF COST ESTIMATE <br />I, Stephen E. Moler, a Florida registered engineering, License No. 33193, do hereby certify to Indian River County that this <br />cost estimate has been prepared under my responsible direction for those improvements itemized in this exhibit and that the <br />total cost estimate is true and accurate to the best of my knowledge. This estimate has been prepared, in part, to induce <br />approval by the County of a final plat for the Reserve at Grand Harbor Phase 1 project, and for the purpose of establishing <br />proper surety amounts associated therewith. , ,J%%%11 1101 j1 r <br />ft i <br />Dpitaly squad by stap,e" a ►Asp` The item has been digitally DN: raUS, o--Maatsaer and M0* *;• ' •'�* % = t9 y sned and sealed <br />Inc..z No. 33193 .by STEPHEN E. MOLER, PE on the date adjacent <br />VzG'� 661400 21924. c t St phen E 613Tc : _-to the seal. Printed copies of this document are not <br />181a00021g2�. anStapr,Rn E=lo{ar <br />Date: 202212-0511:16:53.05W * Zconsidered signed and sealed and the signature <br />Stephen E. Moler, P.E. FL #33193 ,STATE OF <br />: must be verified on anyelectroniccopies. <br />Executive Vice PresidentORifl�:•'•�"�� <br />5T <br />1655 27th Street, Suite 2 Page 1 of 1 <br />ADM;NCnDMtN�nstn,ctlonVAaiMenante Bond ksYM"ale Vero Beech, Florida 32960 <br />(Pe&man Bond_FimtriAtphatl__Erteroion_22.1205 xbq (772)567.5300 <br />
The URL can be used to link to this page
Your browser does not support the video tag.