My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-261
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-261
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2023 1:41:37 PM
Creation date
1/5/2023 1:40:31 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/20/2022
Control Number
2022-261
Agenda Item Number
8.J.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
Amendment No. 2 Work Order 25, Hobart Park Renovations
Restroom Connection and Utility Service Plans
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT A - SCOPE OF WORK <br />Task 1 — Modification of Plans <br />The COUNTY desires to modify the previously prepared plans for the restroom facilities at the southern <br />portion of Hobart Park along with the supporting water and sewer utilities servicing the building. The <br />COUNTY is proposing to modify the plans to rotate the building and modify the location of the proposed <br />lift station. <br />Kimley-Horn will update the dimensional site plan that conforms to local agency having jurisdiction <br />permitting requirements which will depict the location of the proposed restrooms, sidewalks and landings <br />and existing surrounding features. <br />Kimley-Horn will update the limited Paving and Grading plan showing the proposed finished floor elevation <br />of the proposed restroom facilities and surrounding grades of proposed sidewalks. The plan will identify <br />paved areas for proposed sidewalk and associated details. <br />Kimley-Horn will update the limited Utility plan showing the existing utilities provided by COUNTY <br />GIS data and as-builts on 77th Street and the utilities provided by the park foreman. <br />Kimley-Horn also understands that the client desires to not connect the existing restroom east of the <br />existing drainage canal to the public force main to the north. Previously, this was proposed to be <br />connected. This modification will remove the design and lift station for this proposed connection. <br />In summary, the following plans will be updated by the Consultant: <br />• Site Plan • Utility Plan <br />• Paving and Grading Plan • Detail Sheets <br />Kimley-Horn will revise the plans to address up to one (1) round of comments from each of the <br />permitting agencies which are being permitting through as part of the previous work order. <br />EXHIBIT B — FEE SCHEDULE <br />The COUNTY agrees to pay, and the Consultant agrees to accept for services rendered pursuant <br />to this Agreement fees inclusive of expenses in accordance with the following: <br />A. Professional Services Fee <br />The basic compensation mutually agreed upon by the Consultant and the COUNTY is as <br />follows: Lump Sum Components <br />Task Labor Fee <br />Modification of Plans $ 3,500 <br />TOTAL $3,500 <br />
The URL can be used to link to this page
Your browser does not support the video tag.