Laserfiche WebLink
EXBIBIT C <br />MMBV <br />I <br />\`1�111t111t1/��/ <br />014 G. -8; <br />'-,'A fl r <br />No. 72460 - Z <br />, <br />i <br />ArE OF <br />ENGINEER'S OPINION OF PROBABLE COST���``� <br />FDOT CONSTRUCTABILITY PLANS ���O&A l <br />4111���` <br />PROJECT' NAME: hails To Trails 1.4 Mile Extension of Historic `Trans -Florida Rail Trail <br />(Unit Costs Obtained from FDOT Item Average Unit Cost Tables Front 2021/05/01 to 2022/04/30 - Markert Area 11) <br />77" Eahinrer kat no ewdnd err the n,st of Cabal, mNuiats, eynlpn,rnt orsan•lces fnrnisired by Debars, or o+rr thr Caerirnu r S m ahod, of de mduingpriecs. ar nrrr cangxtitirr bidrting or market ma 'fllinrrx Oprnfnns of <br />pmhabte mts provided heroix ore ha ed or, the h jarnxnian knonrk to dre F-typineel at this tine ext repreuni only the Fxghreer's judgrnenf ns a design pmfcxriamx,l faa,illar with the rou.drntrim, mdovy, 77c Engineer <br />normae and doer AN guuwntee That propnsata, bids, ,x achrul constrncdnr, casts "U not r y frnra its ophdon of probable ros/s. <br />PAY ITENI NO. <br />DESCRIPTION <br />UNIT <br />PROJECT <br />UANT17'Y <br />I UNCI' COST <br />PROJECT COST <br />ROADNVAY PAY ITEMS <br />101-1 <br />MOBILIZATION <br />LS <br />I <br />$ 30,000.00 <br />S 30,000.00 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />LS <br />I <br />S 10,000,00 <br />S 10,000.00 <br />104-1 <br />ARTIFICIAL COVERINGS / EROSION CONTROL ABATEMENT PRODUCTS <br />SY <br />8,150 <br />$ 5.00 <br />S 40,750.00 <br />104-10-3 <br />SEDIMENT BARRIER <br />LF <br />14,800 <br />S 2.32 <br />S 34,336,00 <br />104-15 <br />SOIL TRACKING PREVENTION DEVICE <br />EA <br />2 <br />S 5,000.00 <br />$ 10,000,00 <br />I t0-1-1 <br />CLEARING AND GRUBBING <br />AC <br />4,50 <br />S 13,640.00 <br />S 83,880.00 <br />120-1 <br />REGULAR EXCAVATION <br />CY <br />2,725 <br />S 7.14 <br />S 19,456.50 <br />120-6 <br />EMBANKMENT <br />CY <br />t00 <br />S 14,42 <br />S 1,442.00 <br />1604 <br />TYPE B STABILIZATION 12" (LBR40) <br />SY <br />13,000 <br />S 3.45 <br />S 109,850,00 <br />285-704 <br />OPTIONAL BASE GROUP 4 (6' CEMENTED COQUINA) (LBR 100) <br />SY <br />10,500 <br />S 15,00 <br />$ 157,500.00 <br />285-706 OPTIONAL BASE GROUP 6 (8" CEMENTED COQUINA) (LBR 100) <br />SY <br />300 <br />$ 15.44 <br />S 4,632.00 <br />334.1-12 SUPERPAVE ASPHALT CONCRETE, TRAFFIC B (TYPE SP -9.5.1.5") <br />TN <br />790 <br />$ 147.47 <br />S 116,501.30 <br />334-1-13 SUPERPAVE ASPHALT CONRETETRAFFIC C (TYPE SP -9.5, I")(FPL EASEMENT AREA) <br />TN <br />14 <br />$ 102.44 <br />S 1,434.16 <br />334-1-13 SUPERPAVE ASPHALT CONRETE TRAFFIC C (TYPE SP -12.5, 1.5") (FPL EASEMENT AREA) <br />TN <br />21 <br />S 102.44 <br />S 2,151.24 <br />430-175-115 PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 15" S/C'D (RCP) <br />LF <br />24 <br />S 23697 <br />S 5,684.88 <br />430-175-124 PIPE CULVERT, OPTIONAL MATERIAL, ROUND, 24" S,CD (RCP) <br />LF <br />80 <br />$ 119.53 <br />S 9,562.40 <br />430-175-224 PIPE CULVERT, OPTIONAL NIXI"ERIAL, ROUND, 19'x30" S -CD (ERCP) <br />LF <br />40 <br />S 141.82 <br />5 5,672.80 <br />570-1-2 PERFORMANCE TURF, SOD (MATCH EXISTING) <br />SY <br />6,450 <br />$ 3.32 <br />S 21,414.00 <br />700-1-11 SCRUB JAY TRAIL SIGNAGE (INSTALLATION ONLY) <br />AS <br />2 <br />$ 453.23 <br />S 916.46 <br />700-1-11 SINGLE OST SIGN, UP TO 12 SF <br />AS <br />2 <br />S 458.23 <br />S 916.46 <br />519-78 BOLLARDS (COLLAPSIBLE) <br />EA <br />4 <br />S 1,500.00 <br />S 6,000.00 <br />999-1 ASBUILT SURVEYING AND RECORD DRAWING PREPARATION (BY REGISTERED <br />SURVEYOR) <br />1S <br />I <br />S 20,000.00 <br />S 20,000.00 <br />- <br />ROADWAY PAY ITEMS SUBTOTAL <br />S 692,100.20 <br />IMPROVEAIENTSSUBTOT.AL S 692,100.20 <br />20l CONTINGENCY S 138,420.04 <br />IMPROVENIENTS TOTAL S 830,520.24 <br />LS=I.ampSum DA -Day LF=Linear Fool AC -Acre SY=SqunreYard CY=CubicYnrd TN=Ton <br />F-4 - Ench AS =Assembly Ci3 = Cross Mile P1= Per IntersecEioa <br />