Laserfiche WebLink
Task 2: Financial Assurance <br />The COUNTY operates both a Class I landfill and a Construction and Demolition Debris <br />Landfill through a contract with Republic Services. In accordance with Chapter 62-701, F.A.C., <br />the COUNTY is required to submit cost adjustments based on an inflation factor for closure <br />annually. Every five years, the closure cost estimate must be revised by recalculating the total <br />cost of closure. <br />Subtask 2.1 Closure Cost Estimate Adjustment <br />CONSULTANT will provide the Closure Cost Estimate adjustment to the COUNTY based on <br />the most recent Implicit Price Deflator for Gross National Product published by the U.S. <br />Department of Commerce in its Survey of Current Business. CONSULTANT will include <br />escrow account balance recommendations for Fiscal Year 2021-2022, and escrow budget <br />recommendations for Fiscal Year 2022-2023. <br />Subtask 2.2 Survey and Airspace Assessment <br />CONSULTANT will provide surveys and assessments of airspace used by our subconsultant, <br />Masteller, Moler & Taylor, Inc. (MM&T) for the Class I landfill and C&D debris disposal <br />facility. The topographic survey will be performed on the entire COUNTY landfill site, including <br />the Class I waste area (Segment I, II, and III and the ditches and roadways surrounding the Class <br />I area), the C&D disposal facility (waste area, fence line, ditches and berms adjacent to C&D <br />Debris site), expansion areas, stormwater pond, and administrative area. <br />The deliverable from MM&T will consist of a survey identifying the dates the field survey was <br />completed. The airspace consumed, and the remaining airspace will be calculated and provided. <br />The survey shall also include the results of the volumetric calculations for Segments II and II <br />portions of the Class I landfill, and the C&D disposal facility. Deliverables accompanying the <br />survey are as described in MM&T's proposal. <br />For the Class I Landfill (Segments I, II, and III), we will include an evaluation of the waste <br />compaction, so the COUNTY may determine whether Republic Services is meeting its <br />contractual compaction requirements. <br />Ongoing projects at the landfill are also anticipated to impact one of the aerial targets used to <br />conduct the annual survey. This Task includes replacement of one aerial target, including <br />physical reconstruction (pouring of concrete and painting), as well as surveying the new location <br />of the target. The target will be relocated to a location that is determined by SWDD within the <br />allowable distance from the current target. <br />Page 2 of 5 <br />