Laserfiche WebLink
AMENDMENT NO.2 <br />011,03_. ►_ ITS _� 1l ' ' §� <br />ROADWAY IMPROVEMENTS AND DRAINAGE IMPROVEMENTS AT THE IRC <br />LANDFILL <br />EXHIBIT A <br />SCOPE OF WORK <br />PROJECT UNDERSTANDING <br />Indian River County (County) Solid Waste Disposal District (SWDD) previously authorized <br />Kimley-Horn and Associates (Consultant) to provide engineering services related to the paving of <br />the yard waste drop-off area driveway and minor drainage improvements. A pre -application <br />meeting with Indian River Farms Water Control District (IRFWCD) indicated that additional <br />improvements will be required for the roadway crossing of the canal, including the full <br />replacement of the culvert, additional drainage improvements, canal restoration and regrading of <br />the entire northern bank of the canal within the project limits. These improvements will be required <br />in order to obtain the necessary IRFWCD permits for the project. This amendment provides for <br />additional design, survey and construction administration services associated with the required <br />modifications. <br />SCOPE OF SERVICES <br />Task 1: Landfill Roadway Improvements <br />Design review and pre -application meeting with Indian River Farms Water Control District <br />(IRFWCD) indicated that the existing CMP culvert could not be extended under a paved road, or <br />with utility crossings above it. Therefore, the existing CMP must be replaced with RCP To <br />maximize cover and minimize the amount of required fill, the County has elected to proceed with <br />elliptical RCP to replace the CMP. This requires minor redesign of the details for the crossing, as <br />well as the addition of a maintenance of operations plan. The construction must take place such <br />that access to the yard waste area is maintained at all times. This will be achieved via a temporary <br />crossing to the east of the existing crossing. Additional sheets, details and notes will be required <br />to convey the requirements to the contractor. This task has been amended to include the additional <br />design services, as well as three coordination meetings with IRFWCD and additional services <br />during construction to provide construction administration for the additional work area. <br />Task 2: Drainage Improvements (Lump Sum) <br />The pre -application meeting with IRFWCD also revealed that the cross section of the canal has <br />eroded over time. IRFWCD is requiring that the County restore the cross section to match that up <br />and downstream of the roadway crossing (i.e. narrowing of the top -of -bank to top -of -bank <br />dimension), and restore the north side berm that prevents sheet flow drainage into the canal. This <br />task has been amended to design the canal restoration, replace the north berm, and reconfigure <br />the drainage in the yard waste drop off area to flow back to the drainage swale on the western <br />perimeter (as originally designed). This amended task also includes contracting with a licensed <br />Page] of 5 <br />