My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2022-268
CBCC
>
Official Documents
>
2020's
>
2022
>
2022-268
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/5/2023 2:20:34 PM
Creation date
1/5/2023 2:18:51 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
12/20/2022
Control Number
2022-268
Agenda Item Number
15.B.4.
Entity Name
Kimley-Horn and Associates, Inc.
Subject
CCNA2018 Work Order 47 Amendment No. 2 for Roadway Improvements
and Drainage Improvements at the IRC Landfill
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
11
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EXHIBIT B <br />AMENDED FEE SCHEDULE <br />The Consultant will provide these services in accordance with our Continuing Consulting Engineering Services Agreement for <br />Professional Services dated May 18, 2021, by and between INDIAN RIVER COUNTY, a political subdivision of the State of <br />Florida ("COUNTY') and Kimley-Horn and Associates, Inc. ("Consultant"). <br />Kimley-Horn will perform Tasks 1 through 3 for the total lump sum fee as detailed below. Individual task amounts are <br />informational purposes only. All permitting, application, and similar project fees will be paid directly by the County. <br />ESTIMATE FOR ENGINEERING SERVICES <br />PROJECT: Roadway and Drainage Improvements at the <br />IRC Landfill <br />CLIENT: Indian River County <br />ESTIMATOR: JTG <br />DIRECT LABOR MAN-HOURS) <br />AMENDMENT 2 <br />TASK <br />Senior <br />Project <br />Manager <br />Senior <br />Civil <br />Engineer <br />Civil <br />Engineer <br />Subconsultants <br />($ <br />Amendment <br />No. 2 Total <br />Amendment <br />No. 1 Total <br />Original <br />Authorization <br />Amended <br />Total <br />Task 1- Landfill Roadway Improvements <br />28 <br />20 <br />48 <br />$ <br />17,280 <br />$ <br />- <br />$ <br />21,050 <br />$38,330 <br />Subtask 1.1 - Conceptual Layout and Construction <br />Sequencing (Lump Sum <br />0 1 <br />0 <br />0 <br />$ - <br />$ <br />- <br />$ <br />- <br />$ <br />3,320 <br />$ 3,320 <br />Subtask 1.2 - Design (Lump Sum) <br />0 <br />0 <br />0 <br />$ - <br />$ <br />- <br />$ <br />- <br />$ <br />8,710 <br />$ 8,710 <br />1.2.1- 30% Design <br />0 <br />0 <br />0 <br />$ - <br />$ <br />- <br />$ <br />- <br />$ <br />1,360 <br />$ 1,360 <br />1. 2.2 - 60% Design <br />0 <br />0 <br />0 <br />$ - <br />$ <br />- <br />$ <br />- <br />$ <br />1,360 <br />$ 1,360 <br />1. 2.3 - 90% Design and Final Bid Package <br />12 <br />12 <br />24 <br />$ - <br />$ <br />8,640 <br />$ <br />- <br />$ <br />5,990 <br />$ 14,630 <br />Subtask 1.3 - Permitting (Lump Sum) <br />0 <br />0 <br />0 <br />$ - <br />$ <br />- <br />$ <br />- <br />$ <br />3,760 <br />$ 3,760 <br />Subtask 1.4 - Construction Services (Not -to -Exceed) <br />16 <br />8 <br />24 <br />$ - <br />$ <br />8,640 <br />$ <br />- <br />$ <br />5,260 <br />$ 13,900 <br />Task 2 - Drainage Improvements (Lump Sum) <br />16 <br />16 <br />24 <br />$ 1,800 <br />$ <br />12,320 <br />$ <br />4,320 <br />$ <br />7,480 <br />$24,120 <br />Task 3 - Site Plan Coordination (Not -to -Exceed) <br />0 <br />0 <br />0 <br />$ - <br />$ <br />- <br />$ <br />4 260 <br />$ <br />8,530 <br />$12,790 <br />Totals <br />44 <br />36 1 <br />72 1 <br />$ 1,800 <br />$ <br />29,600 <br />$ <br />8,580 <br />$ <br />37,060 <br />$ 75,240 <br />Lump sum fees will be invoiced monthly based upon the overall percentage of services completed. Payment will be due per the <br />contract terms. <br />Page 3 of 5 <br />
The URL can be used to link to this page
Your browser does not support the video tag.