My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/08/2022
CBCC
>
Meetings
>
2020's
>
2022
>
11/08/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/9/2023 2:12:14 PM
Creation date
1/9/2023 1:45:51 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/08/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
255
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
INDIAN RIVER COUNTY <br />CONSTRUCTION ENGINEERING AND INSPECTION (CEI)SERVICES <br />FOR 43f2D AVENUE (18THSTREET TO 26THSTREET) <br />FDOT FM NO 431759 <br />Project Number: IRC -0853 <br />AMENDMENT NO. 1 TO THE PROFESSIONAL SERVICES AGREEMENT BETWEEN CONSOR <br />ENGINEERS, LLC AND INDIAN RIVER COUNTY, FLORIDA. <br />This is an amendment to the existing Professional services Agreement (AGREEMENT) <br />dated June 11, 2019 between Consor Engineers, LLC (CONSULTANT) and Indian River County <br />(COUNTY). This amendment addresses changes in "Section 4 — Term; Time for Completion" <br />and "Section 5 — Compensation" of the AGREEMENT. <br />Amendment Description <br />This Amendment includes the following: <br />"SECTION 4 — TERM; TIME FOR COMPLETION" is being modified to incorporate the following: <br />Consultant services are required until the completion and closeout of the project, <br />scheduled for February 2023. <br />"SECTION 5 — COMPENSATION" is being modified to incorporate the following: <br />Exhibit A - Part 1 - the amount of $126,604.77 represents the actual cost during the <br />period associated with the 87 -day delay for the FDOT 54 -inch drainage trunk line repair. <br />Exhibit A - Part 2 - The amount of $159,949.55 represents projected costs to complete <br />the project associated with other delays, including the FPL relocations. <br />Total increase of $286,554.32, bringing the AGREEMENT total to $2,739,314.99 for <br />Services to be rendered. <br />(THE REMAINDER OF THIS PAGE IS INTENTIONALLY BLANK) <br />45 <br />
The URL can be used to link to this page
Your browser does not support the video tag.