Laserfiche WebLink
The Consultant will provide professional services for a lump sum fee as follows: <br />Task 1: Design Phase Services $ 101,371 <br />Task 2: Bid Phase Services $ 7,331 <br />Task 3: Construction Phase Services $ 49.994 <br />Total Tasks 1-3: $ 158,696 <br />ADDITIONAL SERVICES <br />The following services can be provided as additional services under separate future task <br />order: <br />• Surveying and Mapping <br />• Geotechnical Investigation <br />• Fuel Tank Design <br />• Coordination with property owners and recording easements for the generator <br />installation. <br />• Construction Phase Services <br />INFORMATION PROVIDED BY OWNER <br />• Record drawings <br />• Access to WWTP site <br />• FPL bills <br />K:\WPB_Civil\General\Black\Florida\IRCU\Central WWTP Generator Replacement\20221013 - Gifford WWTP Gen .doc 75 <br />