Laserfiche WebLink
Table 2 <br />BUDGET ESTIMATE <br />PHASE 1 - SITE PREPARATION FOR CELL 3 CONSTRUCTION <br />CLASS I LANDFILL - SEGMENT 3 EXPANSION <br />INDIAN RIVER COUNTY, FLORIDA <br />PHASE 2: PREPARATION OF CONSTRUCTION DOCUMENTS <br />ITEM <br />BASIS <br />RATE <br />QUANTITY <br />ESTIMATED <br />COST <br />A. Professional Services <br />a. Senior Principal <br />Hr <br />$260.00 <br />16 <br />$4,160.00 <br />b. Principal <br />Hr <br />$245.00 <br />0 <br />$0.00 <br />c. Senior Professional <br />Hr <br />$225.00 <br />16 <br />$3,600.00 <br />d. Project Professional <br />Hr <br />$203.00 <br />0 <br />$0.00 <br />e. Professional <br />Hr <br />$176.00 <br />42 <br />$7,392.00 <br />f. Senior Staff Professional <br />Hr <br />$154.00 <br />30 <br />$4,620.00 <br />g. Staff Professional <br />Hr <br />$132.00 <br />0 <br />$0.00 <br />Subtotal Professional <br />$19,772.00 <br />B. Technical/Administrative Services <br />a. Senior Designer <br />Hr <br />$119.39 <br />76 <br />$9,073.64 <br />b. Designer <br />Hr <br />$117.10 <br />0 <br />$0.00 <br />c. Senior Drafter/Senior CADD Operator <br />Hr <br />$81.39 <br />0 <br />$0.00 <br />d. Project Administrator <br />Hr <br />$83.08 <br />0 <br />$0.00 <br />e. Clerical <br />Hr <br />$49.96 <br />0 <br />$0.00 <br />Subtotal Technical/Adminis <br />$9,073.64 <br />C. Reimbursables <br />a. Lodging <br />Da <br />$100.00 <br />0 <br />$0.00 <br />b. Per Diem <br />Da <br />$55.00 <br />0 <br />$0.00 <br />c. Communications Fee <br />3% Labor $0.03 <br />$28,846 <br />$865.38 <br />d. CADD Computer System <br />Hr <br />$15.00 <br />76 <br />$1,140.00 <br />e. Vehicle Rental & Fuel <br />Da <br />$150.00 <br />0 <br />$0.00 <br />f. 8"x11" Photocopies <br />Each <br />$0.12 <br />400 <br />$48.00 <br />CADD Drawin s <br />Each <br />$3.00 <br />200 <br />$600.00 <br />Subtotal Reimburs <br />$2,653.38 <br />TOTAL ESTIMATED BUDGET: PHASE 02 <br />$31 499.02 <br />151 <br />