Laserfiche WebLink
PROJECT DESCRIPTION <br />Construct a water storage/pollutant removal system (stormwater park) on an unimproved 38.35- acre parcel, <br />owned by the County, located at 7205 8`h Street, Vero Beach, FL 32968. The primary goal of the proposed <br />system is to improve water quality in the Indian River Lagoon by addressing the Total Maximum Daily Loads <br />(TMDLs) identified in the Central Indian River Lagoon's Basin Management Action Plan (BMAP). <br />The conceptual design calls for construction of a water storage/treatment pond on the former agricultural <br />property. A portion of the stormwater flow from the Indian River Farms Water Control District (IRFWCD) <br />Lateral C drainage canal will be diverted into the created pond for storage and treatment prior to ultimate <br />discharge into the Lagoon. Utilizing a constructed pump station, stormwater from the Lateral C canal will be <br />brought onto site where aquatic vegetation will be used to naturally uptake phosphorus and nitrogen, lowering <br />the concentrations before returning the water by controlled releases back to the canals before finally <br />discharging into the Lagoon. <br />The pond will also function as a storage pond during heavy rain events with water released during drier times, <br />reducing the pulse discharges to the Lagoon. <br />Benefits <br />• Reduction of pollutant loading to the Indian River Lagoon <br />(consistent with FDEP type projects favorable for their <br />environmental benefits). <br />• Flexibility in management of pulsed discharges to the Lagoon. <br />Ability to hold water in the storage pond during heavy rain events, <br />and actively manage the pond's levels and the riming of releases <br />back to the network of canals, reducing potential impacts to the <br />Lagoon. <br />• Compliance with BMAP. While not completely quantifiable at this <br />time, the proposed project will be eligible for total nitrogen and <br />total phosphorus BMAP credits. <br />Total Project Cost <br />$6,250,000 <br />Appropriations Request <br />$1,875,000 (30%) <br />