My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1976-063
CBCC
>
Resolutions
>
1970'S
>
1976
>
1976-063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 10:18:13 AM
Creation date
1/23/2023 10:18:04 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1976-063
Approved Date
09/08/1976
Resolution Type
Adopting Building Permit Fee Schedule
Subject
Adopting Building Permit Fee Schedule Authorized 8/6/1975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
ab <br />40 <br />ELECTRICAL PERMIT FEES <br />When application for permit is approved and before a permit is issued, <br />a fee therefor shall be paid on the following schedule of rates: <br />` Present Bldg. Dtr. County Adm. <br />LIGHT OUTLETS <br />1 to 8 outlets, inclusive - minimum <br />Over 8 outlets, the minimum charge of <br />$4.00 for the first 8 outlets plus <br />each addtttonal outlet <br />SERVICES <br />Temporary for construction <br />100 ampere and under <br />Over 100 ampere to 200 ampere <br />Over 200 ampere to 400 ampere <br />Over 400 ampere to 600 ampere <br />Over 600 ampere to 800 ampere <br />For each additional 100 ampere (over 800) <br />SERVICE CHANGES <br />100 ampere and under <br />Over 100 ampere to 200 ampere <br />Over 200 ampere to 400 ampere <br />Over 400 ampere - each add'l 100 ampere <br />SWITCHBOARDS OR PANELS <br />By amperes, same as"Services" <br />EQUIPMENT <br />Drop in range <br />Range Top <br />Oven <br />Sign outlet <br />and all other appliance. outlets <br />inspected in conjunction with rough <br />wiring, including room space heaters, <br />ceiling heat, etc. !ach <br />HO.TORS <br />Up to 1 H.P. <br />1 to 3 H.P.- <br />3 <br />.P.-3 to 5 H.P. <br />Over 5 H.P. up to 10 H.P.(per add'1 H.P.) <br />10 H.P. <br />-,,Over 10 H.P. (per add'.1 H.P.) <br />BACHINES <br />X -Ray - Portable, dentist <br />'I -Ray - Stationary, doctor <br />Dtathermtc and Electronic outlet <br />GENERATORS & TRANSFORMERS <br />Each up to 5 KVA . <br />Each generator or transformer over <br />5 KVA thru 10 KVA <br />Each generator or transformer over <br />10 KVA thru 15 KVA <br />Each generator or transformer over <br />15 KVA thru 20 KVA <br />Eaph generator or transformer over <br />20 KVA thru 25 KVA <br />Each generator or transformer over <br />25 KVA thru. 30 KVA <br />Each generator or transformer over <br />30 KVA . <br />Generators and transformers, where located <br />on same floor, fee for largest, plus $1.00 <br />for each additional <br />WELDING MACHINES <br />Up to 25 amperes <br />Over 25 amperes to 50 amperes <br />Over 50 amperes - plus $2.00 for each <br />additional 25 amperes or fraction part <br />thereof <br />4.00 <br />. 10 <br />5.00 <br />2.00 <br />3.00 <br />4.00 <br />5.00 <br />6. oo <br />1.00 <br />5.00 <br />5.00 <br />6.00 <br />1.00 <br />1.50 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />1.00 <br />2.00 <br />3.00 <br />1.00 <br />8.00 <br />.25 <br />2.50 <br />5.00 <br />2.50 <br />k�i; <br />4.00 <br />6.00 <br />8.00 <br />10.00 <br />15.00 <br />15.00 <br />2.00 <br />3.00 <br />
The URL can be used to link to this page
Your browser does not support the video tag.