My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1976-063
CBCC
>
Resolutions
>
1970'S
>
1976
>
1976-063
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
1/23/2023 10:18:13 AM
Creation date
1/23/2023 10:18:04 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1976-063
Approved Date
09/08/1976
Resolution Type
Adopting Building Permit Fee Schedule
Subject
Adopting Building Permit Fee Schedule Authorized 8/6/1975
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
m <br />PLUMBING PERMIT FEES (Continued) <br />FURNACES AND HEATING EQDIPHENT PER UNIT <br />INSTALLED <br />For the first 100,000 B.T.U. per hour <br />0 or fractional part <br />For each additional 100,000 B.T.U. per <br />hour or frac 'I part <br />Note: The rating of furnace and heating <br />equipment shall be based on the <br />BTU input of fuel used per hour. <br />WELLS (Drilling or Digging) <br />Sprinkler Systems <br />WATER STORAGE TANKS (up to 1,000 gallons) <br />Each add'l 1,000 gallons or fraction ' <br />SOLAR NATER HEATER SYSTEM <br />B1 dg. Dir. Countu Ac <br />NECHANICAL PERMIT FEES <br />jj <br />When application for permit is approved and before a <br />permit is issued, <br />a fee therefor shall be paid based on the following schedule of rates: <br />AIR CONDITIONING AND REFRIGERATION <br />.For the purpose of charging fees, <br />1ton of refrigeration will equal 12,000 <br />B.T.U's per hour or i H.P. total connected load <br />The first 5 tons or fractional part <br />7.50 <br />The next 5 tons up to and including <br />10 tons - per ton <br />1.00 <br />Over 10 tons - per ton add'1 <br />2.00 <br />A11 major repairs or replacements, same <br />fees as above. <br />WINDOW UNITS OR WALL UNITS (Where no <br />construction work is involved in the <br />building or duct work attached) <br />For the first 5 units - each <br />3.00 <br />For the next 50 units - each <br />2.00 <br />For the next 100 units - each <br />A11 others - each <br />.1.50 <br />1.00 ' <br />'CORK STARTED BEFORE A PERMIT IS ISSUED THE FEE SHALL <br />BE DOUBLED <br />
The URL can be used to link to this page
Your browser does not support the video tag.