Laserfiche WebLink
M j MASTELLER & MOLER, INC. <br />M1 — CIVIL ENGINEERS — <br />EXHIBIT A <br />1655 27" <br />Ste. 2, Vero Beach, FL 32960 <br />(772)567-5300 <br />Masteller & Moler, Inc. is pleased to present you with Work Order Number 3 which provides <br />Professional Engineering Services for performance of conceptual site planning services for the <br />replacement of the existing restroom building and associated new wastewater facilities to be <br />located east of the football field at Victor Hart Park. <br />Project Description: <br />The Indian River County Parks and Conservation Services Department (IRCPCSD) plans to replace the <br />existing restroom building and septic system serving the football field and playground area located <br />at the southeast corner of Victor Hart Park. The existing restroom building and septic system will <br />need to remain active during construction of the new facilities, and the project will be phased such <br />that the existing restroom building and septic system are demolished and removed following <br />construction of the new restroom and concession building. The new facilities are intended to serve <br />park visitors at the football field and playground area. Said project requires the design of a lift <br />station, force main system, and connection to the existing Indian River County Department of Utility <br />Services (IRCDUS) force main network and potable water main network, as well as a site, paving, <br />and grading plan to support Administrative Approval for the new building. <br />The existing building is served by a septic system including septic tank and drain field. The baseball <br />fields located to the east are served by private, canned lift stations. It is understood that an existing <br />underground force main system conveys flows from the baseball field lift stations east to the existing <br />IRCDUS force main network along 43rd Avenue. <br />In order to confirm the County will support the design of the Project, Masteller & Moler, Inc. <br />proposes to perform the following scope of services: <br />Scope of Work: <br />Task A — Concept Planning: Masteller & Moler, Inc. shall prepare a Conceptual Site Plan (CSP) for <br />the proposed new restroom building & wastewater facilities to serve the existing football field and <br />playground area. It is our understanding that County will provide building footprints/ elevation <br />views for our use in depicting the proposed restroom building replacement as well as the CAD file(s) <br />for the As -Built Plan of the Parking Lot & Drainage Improvement Plans which were completed in <br />2018. <br />Specifically, we shall develop a CSP that includes the layout of the new restroom building and <br />wastewater facilities and the demolition of the existing building and removal of the existing septic <br />system with necessary modifications to the existing improvements within the project limits to <br />support the new facilities. <br />Consultant shall provide County with copies of the initial planning effort and make reasonable <br />revisions based on County's comments. <br />Page 1 of 2 <br />