Laserfiche WebLink
WATER <br />1. Main Extension Charge $2.19 times footage fronting <br />on main. <br />2. Plant Capacity Charge $.36/gallon of demand* <br />3. Water Meter Connection Charge <br />5/8" x 3/4" meter $ 75.00 <br />1" meter $11.5.00 <br />1•-1/2" meter $190.00 <br />2" meter $265.00 <br />*Meters over 2" in size are charged upon the estimated actual cost of <br />installation. Where actual charges differ from estimates, the difference <br />=- will be refunded by the utility if the total cost is less than the <br />estimate, or paid by the contributor prior to the initiation of water <br />service if the actual cost exceeded the estimated cost. <br />SEWER <br />1. Main Extension Charge $6.54 times footage fronting <br />on main. <br />2. Plant Capacity Charge $.36/gallon of demand* <br />*Plant Capacity Charges are computed by multiplying the daily rates of <br />demand by the above rates for the specified service. The daily rated <br />gallonage demand varies depending upon type of usage, for example, <br />apartments = 250 gpd; single family residence 3/4" x 5/8" meter = 350 <br />gpd; commercial units based upon projected actual demand. <br />Dated this 21st day of septemher —, 1977 <br />BOARD OF COUNTY COMMISSIONERS <br />OF INDIAN RIVER COUNTY, FLORIDA <br />By: <br />Attest: -Q-1c, d_ <br />AppZaBy:-�-��/\ <br />C6bnty Attorney <br />Page 2 of 2 <br />oR0bu1PALIE28b8 <br />