My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-008
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-008
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/2/2023 11:57:06 AM
Creation date
2/2/2023 11:56:02 AM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
01/17/2023
Control Number
2023-008
Agenda Item Number
8.R.
Entity Name
Edlund, Dritenbas, Binkley Architects and Associates, P.A
Subject
Work Order No. 8 for architectural services at Hosie Shumann Park Restroom, RFQ 2018063
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
6
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
EOLUND - DRITENBA8 - BINKLEY <br />ARCHITECTS AND ASSOCIATES, P.A. <br />65 Royal Palm Pointe, Ste D <br />Vero Beach, FL 32960 <br />Ph: (772) 5694320 Fax (772) 569-9208 <br />December 15, 2022 <br />TO: Indian River County Parks & Recreation <br />Attn: Joseph Tilton <br />RE: Proposal for Architectural Services Hosie Schuman Park Restroom Building <br />Architects Comm. # 100222 VB <br />Dear Sir: <br />This letter shall serve as our proposal and agreement for the preparation of documents necessary <br />for building construction of the above referenced project. <br />I. SCOPE <br />The scope of work will consist of providing design and construction documents for a men and <br />women's public restroom approximately 349 S.F. The previously completed Jungle Trail <br />Restroom plan will be used and will be modified to be more like Hobart Park Restroom exterior <br />with a metal roof. <br />II. ARCHITECTS BASIC SERVICES <br />The Architect shall provide full permit documents for construction to be constructed by <br />subcontractors or general contractor of the Owner's choice. Documents and services provided by <br />the Architect and his employed Structural, Mechanical, Electrical and Plumbing Engineering <br />sub -consultants will include the following: <br />1) Data collection, additional field verifications, and meetings with Owner, if needed. <br />2) Construction documents, including all necessary plans for building permit <br />submission. <br />3) Address plan review comments and make revisions as required. <br />4) Assist in obtaining construction bids, bidding administration, and addendums as <br />needed. <br />5) Construction administration shall include a preconstruction meeting, periodic <br />construction observations twice monthly, construction meeting with Owner and G.C., <br />RFI responses, submittals review, review of pay applications and any changes in the <br />work. A punch list and final inspection will also be done. <br />
The URL can be used to link to this page
Your browser does not support the video tag.