My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/20/2022
CBCC
>
Meetings
>
2020's
>
2022
>
12/20/2022
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/3/2023 9:38:25 AM
Creation date
2/3/2023 9:27:12 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/20/2022
Meeting Body
Board of County Commissioners
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
170
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
KM <br />Ni 1 +TE ER R N101,ER. ENC'. <br />-4 CIVIL ENGINEERS -- 1215/2022 <br />RESERVE AT GRAND HARBOR (PHASE 1) <br />CERTIFIED COST ESTIMATE <br />FINAL LIFT ASPHALT ": <br />Description <br />Quantity <br />Unit <br />Unit Price <br />TOTAL <br />Mobilization <br />1 <br />LS <br />$3,500.00 <br />53,500.00 <br />1.25" SP 9.5 - 2nd Lift (Grand Harbor Reserve Sq.) <br />3,321 <br />SY <br />$15.00 <br />549.815.00 <br />Mill Existing Asphalt (1.5") <br />9,579 <br />SY <br />$4.70 <br />$45,021.30 <br />Overlay w/ 1.5" SP 9.5 Asphalt <br />9,579 <br />SY <br />S15.50 <br />$148,474.50 <br />Restripe Pavement <br />1 <br />LS <br />$4,)00.00 <br />S4,000.00 <br />Reset PCP's <br />1 <br />LS <br />$3,000.00 <br />53,000.00 <br />TOTAL <br />$253,810.80 <br />ISurety Amount 125% $317,263.50 <br />CERTIFICATE OF COST ESTIMATE <br />I, Stephen E. Moler, a Florida registered engineering, License No. 33193, do hereby certify to Indian River County that this <br />cost estimate has been prepared under my responsible direction for those improvements itemized in this exhibit and that the <br />total cost estimate is true and accurate to the best of my knowledge. This estimate has been prepared, in part, to induce <br />approval by the County of a final plat for the Reserve at Grand Harbor Phase 1 project, and for the purpose of establishing <br />proper surety amounts associated therewith. %W1 t t 111 rrrf��� <br />���,��G.��G E.NSF•.��% <br />Dig <br />W c= signed by stwpreri ant <br />oZ The item has been digitally signed and seated <br />DN: c=715, o=Masie9les and Moro, .� ; • * ,: g� Y g <br />Inc-, + No. 33193 ::by STEPHEN E. MOLER, PE on the date adjacent <br />16140 i 219241cn= TIXl 1EZ-,Y' : ::to the seat. Printed copies of this document are not <br />1sla00021e2a. cn=st�hen t Tio<<,� ; <br />Dale, 2022.1205 11:16:ss-05C. * considered signed and sealed and the signature <br />Stephen E. Moler, P.E. FL #33193 '. • ' S TAT E O F must be verified on any electronic copies. <br />Executive Vice President �p't` SS O Rtp <br />,,/ONALe,,, <br />Fi"1357 1655 27th Street, Suite 2 <br />ADMiN\Cons,imcticrlMaint n me Bond Estimate Vero Beach, Florida 32960 <br />tPeAorma Bond_ mkihmphait-Extnnion 22-2205.xisx) (772) 567-5300 <br />Page 1 of 1 <br />52 <br />
The URL can be used to link to this page
Your browser does not support the video tag.