My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-023
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-023
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/10/2023 2:24:36 PM
Creation date
2/10/2023 2:24:14 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
01/31/2023
Control Number
2023-023
Agenda Item Number
8.I.
Entity Name
Masteller & Moler, Inc.
Subject
Amendment No. 1 to CCNA2018 Work Order 2 (Parks)
Fran B. Adams North County Regional Park Restroom Facility
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
3
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
M J MASTELLER & MOLER, INC. <br />M, — CIVIL ENGINEERS <br />EXHIBIT A <br />1655 271h Street, Ste. 2, Vero Beach, FL 32960 <br />(772) 567-5300 <br />The Indian River County Parks and Conservation Services Department (IRCPCSD) plans to install a <br />restroom building (provided by others) adjacent to the existing playground area located just north <br />of the softball diamonds at the Fran B. Adams North County Regional Park (WW Ranch Rd & C.R. <br />512). Under Work Order 2, Masteller & Moler, Inc. (MM) performed engineering design and <br />preparation of construction plans, site planning and project permitting, and is authorized to perform <br />bidding services and construction administration and observation services. <br />The project design and permitting phase of the project was completed in October of 2021, and since <br />that date IRCPCSD has selected a different restroom building to be utilized for the project, and <br />several of the permits have expired/ will expire prior to the anticipated date of construction <br />commencement. This Amendment Number 1 to Work Order 2 proposes to provide additional <br />design and permitting services such that IRCPCSD can be in a position to formally bid and construct <br />the project. <br />Scope of Work: <br />Task I — Revised Engineering Design & Preparation of Construction Plans: We shall revise the <br />engineering design as needed to account for the new restroom building footprint, elevations, utility <br />services to within five (5) feet of the new building. Consultant shall prepare plans and specifications <br />which shall include the revised site, grading, and utility plans specific to the newly selected restroom <br />building. Our services shall also include the necessary coordination with the selected Architect for <br />the project such that Tasks I, K, & L of this Amendment Number 1 may be completed. <br />Task J — Revised Electrical Engineering Services: We shall use the services of our electrical <br />engineering sub -consultant Treasure Coast Engineering to provide electrical engineering services for <br />the building redesign. The electrical engineering services will generally include ensuring adequate <br />power is delivered to the restroom building site and furnishing of revised electrical plans and <br />diagrams as necessary. <br />Task K — Permit Reacquisition: We shall update the necessary permit applications to include the <br />new building and revised plan information and make reapplications as necessary for the following <br />permits: <br />• IRC Administrative Approval Resubmittal/ Modification (Review fee $400.00) <br />• IRC Utility Construction Permit (Review fee $154.50) <br />• IRC ROW Permit (Permit extension, assumed no fee required) <br />• IRC SWMS Permit Modification (No fee required) <br />• St. John's River Water Management District (SJRWMD) Letter Modification <br />Resubmittal (Review fee estimated at $270.00) <br />Permit Application fees are not included in this Work Order. <br />Page 1 of 2 <br />
The URL can be used to link to this page
Your browser does not support the video tag.