Laserfiche WebLink
located east of CR 510 immediately north of the Sebastian River High School, an existing pond <br />located on the south side of CR 512 between CR 510 and Sebastian River Lane, and an existing <br />pond located adjacent to and on the west side of CR 510 between 89`h Street and 87th Street. <br />The proposed design will maintain existing drainage patterns with modifications to some <br />drainage structures necessitated by widening of the roadway. A drainage pond north of the <br />Sebastian River High school and the existing drainage pond between 89th Street and 87`h Street <br />will treat the CR 510 drainage. The existing pond on CR 512 between CR 510 and Sebastian Iyer <br />Lane will treat water from CR 510 and intersection improvements at CR 512. A new bo <br />will be installed across CR 510 to replace the existing box culvert at 89th Street. <br />12. Unforeseen issues: If unforeseen issues shall arise, the AGENCY shall cooper ?SkOh the <br />DEPARTMENT to the extent necessary to construct the Project. This shall but not be <br />limited to the execution of documents; allowing the DEPARM ENT and r <br />contractors/consultants to enter upon the real property owned, lea ossessed and/or <br />controlled by the AGENCY upon which the Project is to be constOrlWd or any property adjacent <br />thereto. 4� y <br />13. E -Verify requirements: The AGENCY: <br />• shall utilize the U.S. Department of Homcurity's E -Verify system to verify the <br />employment eligibility of all new employee ired by the AGENCY during the term of the <br />contract; and A- <br />• shall expressly require any co actdts performing work or providing services pursuant <br />to the state contract to lik ' ilize the U.S. Department of Homeland Security's E - <br />Verify system to verify th e loyment eligibility of all new employees hired by the <br />contractor during tntract term. <br />14. This document incor and includes all prior negotiations, correspondence, conversations, <br />agreements, or u r ndings as represented in the Final Proposed Construction plans. <br />Accordingly, it ed that no deviation from the terms hereof shall be predicated upon any <br />prior repreI t on or agreements whether oral or written. <br />15. The.� MENT will provide the AGENCY with as-builts as a part of the final acceptance <br />c <br />additional Insured: The DEPARTMENT shall include the following paragraph as part of Section 7- <br />13.2 of the Standard Specifications for Road and Bridge Construction, Division 1, General <br />Requirements and Covenants (January 2022), as amended, applicable to this Project: <br />"Cause Indian River County to be an additional insured party on the Contractor's Public Liability <br />and Property Damages Liability Insurance policies that insure the Contractor for the described <br />work that it performs under the Contract." <br />-4- <br />