My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-043
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-043
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 2:00:01 PM
Creation date
2/27/2023 1:59:22 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Work Order
Approved Date
02/21/2023
Control Number
2023-043
Agenda Item Number
8.L.
Entity Name
Aptim Environmental and Infrastructure, Inc.
Subject
Work Order No. 20180006-14 Phase 2, for Sector 3 Beach and Dune Restoration Project
Post Construction Biological Mentoring System
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Ecological Associates, Inc. — Scope of Work and Cost Proposal 4 <br />required of EAI during scarp consultation and leveling will be charged separately on <br />a time and materials basis. <br />Tasks 6a -6b: Reporting (FDEP Specific Condition 19) <br />1. Nesting Season Summary: A report summarizing methods, numbers of sea turtle <br />emergences by species, nest fates of all marked nests, and reproductive success of <br />evaluated nests, and an assessment of project performance on sea turtle nesting and <br />reproductive success, including interpretive analyses and graphic representations, <br />will be prepared and submitted to APTIM within 90 days of the completion of all <br />monitoring activities. <br />2. Summary Spreadsheet of Sea Turtle Nesting Activity: At the end of the 2023 <br />nesting season, a permit -required Excel spreadsheet summarizing all nesting <br />activity and reproductive success within the Project and Reference Areas will be <br />prepared and submitted electronically to APTIM/Indian River County, JCP <br />Compliance, and FWC. <br />EAI will submit its monthly billings for the services described above to APTIM in <br />accordance with the fees and schedules set forth in Attachment A. No deposit or advance <br />mobilization fees are required. <br />Ecological Associates, Inc. appreciates the opportunity <br />APTIM. Should you have any questions regarding the <br />associated costs, I can be reached at (772) 334-3729. <br />Sincerely, <br />A Aftt MW� <br />Grace Botson <br />Project Manager <br />c: Niki Desjardin/Director of Operations <br />to be of continued service to <br />enclosed Scope of Work or <br />
The URL can be used to link to this page
Your browser does not support the video tag.