Laserfiche WebLink
13. AutoCAD Drawings: If requested, the AutoCAD file is provided solely for the convenience of the client. Carter <br />Associates, Inc. makes no representations or warranties, either express or implied, as to its suitability for any <br />specific purpose. While we believe this drawing file to be accurate at the time of retrieval, this media and its contents <br />can be easily altered or corrupted either purposely or inadvertently through any number of sources. For this reason, <br />Carter Associates, Inc., its officers, directors and employees shall be indemnified and held harmless from any and <br />all liability that may arise or result from the use of this drawing, map, plat or sketch by any firm, employees, agents <br />or sub -contractors. Opening and or using the file provided herein constitutes acceptance of the provisions stated <br />herein. Standard e -transmittal of the digital files/data in Carter Associates, Inc. existing AutoCAD version is included <br />in this contract. Any modifications to the existing AutoCAD drawing for transmittal purposes or conversion to earlier <br />digital versions, as requested by the client, will be billed as an additional service and shall be invoiced at the <br />applicable hourly rates included herein. <br />14. As -Built Survey Requirements: <br />a) Client shall coordinate with Carter Associates, Inc., to ensure the site area is accessible, and as -built field work <br />is permitted to be completed in a time efficient manner and not in a piece meal fashion. <br />b) Expose all water, force and irrigation mains at 100 feet intervals, all changes of direction, all fittings and valves, <br />or provide other suitable arrangement for accurate utility location. NOTE: Stand Pipe of one inch (1") diameter <br />or greater can be utilized if labeled and placed vertically on top of main and/or fittings. <br />c) Pump out, drain, dewater, or otherwise make all structures and pipes clear and free of water, soil or debris, so <br />accurate location and elevations of structure bottoms, inverts, grates and tops can be obtained. <br />d) Final grade is achieved prior to requesting embankment / earthwork as-builts. <br />e) Adequate notification and time is given to Carter Associates, Inc. for field work and as -built drawing preparation. <br />The time frame should be coordinated and established prior to the end of construction. <br />15. PURSUANT TO SECTION 558.0035 FLORIDA STATUTES, THE <br />CONSULTANT'S CORPORATION IS THE RESPONSIBLE PARTY FOR <br />THE PROFESSIONAL SERVICES IT AGREES TO PROVIDE UNDER THIS <br />AGREEMENT. NO INDIVIDUAL PROFESSIONAL EMPLOYEE, AGENT, <br />DIRECTOR, OFFICER OR PRINCIPAL MAY BE INDIVIDUALLY LIABLE <br />FOR NEGLIGENCE ARISING OUT OF THIS CONTRACT. <br />J:\SURVEY WORK AUTHORIZATIONS\21-459 S EDB Architects—IRC Fire Station #7 AS 3 Rev 013023.docx <br />3 OF 5 <br />