My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-044
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
2/27/2023 2:08:10 PM
Creation date
2/27/2023 2:06:25 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Amendment
Approved Date
02/21/2023
Control Number
2023-044
Agenda Item Number
8.M.
Entity Name
Edlund, Dritenbas, Binkley Architects and Associates, P.A.
Subject
Amendment No.1 for Architectural Services to Work Order No. 5 for Fire Station 7
Project Number
IRC-1911
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
17
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
i=M Bbl <br />ENGINEERING, INC. <br />www.mbyeng.com CA <br />December 5. 2022 <br />Mr. John Binkley Via E-mail (edlunddritenbasbCbell south.net) <br />EDB Architects <br />65 Royal Palm Pointe, Suite D <br />Vero Beach FL. 32960 <br />Subject: Addendum to Original Contract for Professional Engineering Services for <br />Indian River County Fire Station #7 Off -Site Utilities Design <br />City of Fellsmere Indian River County, Florida <br />Engineer's Project Number: 21-0492 ADD1 <br />Dear Mr. Binkley: <br />As per our coordination, we are hereby submitting our proposal to provide additional professional <br />services for the above subject project. This proposal, along with the original contract conditions, <br />shall be considered an addendum to the original executed proposal. <br />Due to recent directive from IRC Public Works Department, the original off-site utilities design <br />for the water and sewer services will be voided and a new route and associated design will be <br />required due to the Indian River County Utilities Department request from their review of the <br />original design plans submitted under the IRCUD application on October 13, 2022. Due to these <br />unforeseen conditions and site modifications, additional professional services for the below items <br />will be required for completion of the project. Addressing these were not anticipated or included <br />in the original scope of work. <br />1. Project coordination with the Surveyor, Architect, FL Gas Transmission and IRC staff. <br />2. Project review and Base Plan updates of the new off-site route survey to be provided to <br />MBV by CAI. <br />3. Attendance at additional Gas Transmission Line location and excavation with surveyor and <br />soft digs company. <br />4. Development of new Off -Site Water and Sewer Utility Plans. <br />5. Development of new Cross Sections and Canal Crossing Plan. <br />6. Revisions to previously design lift station calculations and report reflecting the new sewer <br />FM routing. <br />7. Revisions to the original On -Site Utility plan reflecting the new off-site entry locations. <br />8. Coordination with permit agencies on revised applications and permit packages. <br />535 10t•i St: eet 250 W. Eau Cally Blvd.. t -nr • 1 806 Detawam.Averx,e <br />Aero Beach, FL 32960 Mdboure, =L 32935 FL Pierce, FL 34950 <br />772.569.0035 321.253.1S,0 772.468.9055 <br />Fax: 772.778 3617 Fw_ 37 1 253091 3 Fax 772 778.3617 <br />
The URL can be used to link to this page
Your browser does not support the video tag.