Laserfiche WebLink
EXTENSION OR CONNECTION CHARGES <br />WATER <br />1. Main Extension Charge $2.19 times footage fronting <br />on main. <br />2. Plant Capacity Charge $.36/gallon of demand* <br />3. Water Meter Connection Charges <br />5/8" x 3/4" meter $ 75.00 <br />1" meter $115.00 <br />1-1/2" meter $190.00 <br />2" meter $265.00 <br />*Meters over 2" in size are charged upon the estimated actual cost <br />of installation. Where actual charges differ from estimates, the <br />difference will be refunded by the utility if the total cost is less <br />than the estimate, or paid by the contributor prior to the <br />initiation of water service if the actual cost exceeded the estimated <br />cost. <br />SEWER <br />1. Main Extension Charge <br />2. Plant Capacity Charge <br />$6.54 times footage fronting <br />on main. <br />$.36/gallon of demand* <br />*Plant capacity Charges are computed by multiplying the daily rates <br />of demand by the above rates for the specified service. The daily <br />rated gallonage demand varies depending upon type of usage, for <br />example, apartments = 250 gpd; single family residence 3/4" x 5/8" <br />meter = 350 gpd; commercial units based upon projected actual demand. <br />********** <br />This Resolution shall become effective as of the lst <br />day of February , 1980. <br />BOARD OF COUNTY COMMISSIONERS OF <br />INDIAN RIVER COUNTY, FLORIDA <br />By <br />WfYlard W Sie er , r., C n <br />Attest; <br />Freda Wr g t,' Clerk <br />