Laserfiche WebLink
Monthly Rates <br />$6.00 flat rate per month or 757 of the water bill. whichever is <br />greater. <br />Minimum Charge - $6.00 Flat rate per month. <br />Terms of. Payment - The billing month dates shall coincide with the billing <br />month for sewer service. Dills rendered for less than fifty percent (50%) <br />of the normal billing period will be billed in accordance with Rule <br />25-10.111(2), Florida Administrative Code: "Whenever, for any reason, the <br />period of service for which a bill is rendered is less than fifty percent <br />(50%) of the normal billing period, the charges applicable to such service, <br />including minimum charges, shall be prorated in the proportion that the <br />actual number of service days bears to a thirty (30) day month; except that: <br />(a) Opening bills need not be rendered but may be carried over to <br />and included in the next regular monthly billing. <br />(b) For service taken under flat rate schedules, fifty percent <br />(50%) of the normal charge may be applied. <br />(c) The practice employed by the utility in this regard shall <br />have uniform application to all customers. <br />Reconnection Charges Sewer service discontinued at Consumer's request or <br />for non-payment of bills, will be resumed only upon payment of all past -due <br />bills and penalties, together with the total cost to the Company of <br />discontinuing and reconnecting sewer service lines. <br />EXTENSION OF CONNECTION CHARGES <br />WATER <br />1. Main Extension Charge $5.00 times footage fronting on main. <br />2. Plant Capacity Charge $.50/gallon of. demand* <br />3. Water Meter Connection Charges: <br />5/8" x 3/4" meter $1.00.00 <br />1" meter $150.00 <br />1-1/2" meter $250.00 <br />2" meter $350.00 <br />*Meters over 2" in size are charged upon the estimated actual cost of <br />installation. Where actual charges differ from estimates, the difference <br />will be refunded by the utility if the total cost is less than the estimate, <br />or paid by the contributor prior to the initiation of water service if the <br />actual cost exceed the estimated cost. <br />- 5 - <br />