Laserfiche WebLink
ORDER NO. PSC -2022 -0433 -TRF -EI <br />DOCKET NO. 20220165 -El <br />PAGE 24 <br />Attachment A <br />Page 19 of 64 <br />Thirty -SM Mit Revised Sheet No. 943.1 <br />FLORIDAPOWIER&MCMICUNWANY C8111celsThirty-Sixth Revised SheetlNo. 8.432 <br />CUITUA I I A 131, I'Sf-- HVICL <br />(ORrIONAU) <br />(I oged Scheduld <br />RAT U SO I MR; LL � CS - 2 <br />AVATT.AHJ&. <br />I n all areas scrved- <br />A r_7T <br />In all .1 <br />APPLICATION'. <br />I N <br />Vor vill general eurvice Orinjustrid Cug(mer who quohrias for PinvUlied ulvGSLD�2 (2,000M and ubove) will CUTIW this Dent un d <br />W <br />- r <br />by 200 k W or more upon request orthe company from time to time, and as o Hanuary V-2018 woo taking service pare neat to this <br />$,Cited ule ruriumem with demajos oflexs than 2,000 M may enter an Agreement fiv, service, unriffthia scheduleba"don a Donlan d <br />Charge for a minim am of 2,0001;1:', <br />Charge <br />E L <br />RVICE: <br />JIM <br />3, <br />in <br />Sinow "'.bree phase. Whertz mid at any available standard dishibutionvoltripm All sem_ -icerequiredanpremiges, by (kmtCqnLFAAA he <br />rurnighelihroiigh one mettm Rem le ofserviceis nor <br />MONTHLY RAIM <br />But Charge: $283,22 <br />Demand Oiarges: <br />But Demand ('barge S13,57 perkworDarriand <br />Non -Fact Favoly Charges: <br />Boo Energy Charge 1,689C per kWh <br />Additional Cltargos: <br />See Billing Adjustments seclicn,ShcetNo, 8.030, for additional applicable charges <br />Minimum: The hot Charge phis th e charge for The eurxcurtlyefiecAve But Demood. For those Customers with a Demand or legs than <br />2,000 kW who enter sit opooturnt for service under this ichvdok-, die ininim Ims charge Otoll be the Due Charge plus 2,000kW tinier <br />the Base Demand Cliturtm; therefore die minimum charge is S�77,423,22, <br />Sc' ST CREDITS: <br />A monthly crerfitof($2 19)perkW is allowed based on the curvetaNcti-Fitin Demand, Tice CwWaner has dee option to revise tire firm <br />Demand once during the initial twelve (12) monih jivriod.Thercafter, subject to the Tenn of Service andlor fire Provisions for Early <br />Termination, a change to the Bret Demand may be made pwvi&d that the revision does not decrease the total amount ofl4on-rum <br />Demand during the lesser of: (j) die averwe or the previous 12 mon* or (R) the averse ofilm number of billing niontfis Under this <br />Rate Schedule, <br />CMROES FOR NON-COMPIJANCUOIFOMAILMENT DEMAND, <br />Iftlic Customcr rccotide n highcr Demand duritigtht current p6od thenthe Mirm Dcriand, then the CudDincrivill bc: <br />I Rebilled at S2 MAW for the prior 36 months or the number of months since Ore prior Curtailment period, wlechever iA <br />tess.aril <br />2. Hilled apenaby charge of$4 68NW for the Lurrentmonth. <br />TbekW used for both the rebilling and penalty charge calciilafaris is determined by taki% the difference between the maximum Demand <br />during the current Ottinilmoit lietiodurid the coutbracied lit in Demand rot a Curlailtnentporiod, <br />8.433) <br />Issued by: T Many Cobert, Executive Director, Ratel)evelopment & Strategy <br />Effecth.c. <br />