Laserfiche WebLink
ORDER NO. PSC -2022 -0433 -TRF -El <br />DOCKET NO. 20220165 -El <br />PAGE 41 <br />FLORIDA W)WER & LIM1717COMPANY <br />(Confinuedon Sheet No. 8,657) <br />then the Customer will be; <br />Attachment A <br />Page 36 of 64 <br />Seventh Rs vWxf Shed No. 8.658 <br />CancelsS ixth Revised SheetNla. 8.698 <br />1, rithilled under divothumviolt applicuble firm Or sUbsdUj(!fC1r the (60) <br />months during which the CtwlomcT was billed fiorservicc under this Rate Schedule, or (b) the number of months the <br />Customer has becit billed under this Rate Schcdu1c,ruld <br />2, billed a penally charge of$ t.35 per kw Hanes the number ofluotiths telailled in No, I above times the highest Load <br />Control Ort- oak Deal mid occurring d uringthe curyclat momth or the prior Mclity-threv (23) in onths, <br />SPECIAL PROVISIONS - <br />I. Control of the Customer's load shall be accomplished through the Company's load management systems by use ofcontrol <br />Circuits connected dis Voly It, div ('twonaurs swiNhingvquipmentor lite oustunrers toad may becontrolled byuse ofula <br />energy management IIyslmi where the firm demand or controllable demand level can be establioltedon-madified onlyby <br />means o fjoint accwx by the Otelo m el an a III e Company. <br />a, The Customer shall grunt the Company reasonable access for installing, maintaining. ingpUCting, WP fing arldlOr removing <br />Compang-ownedload control qvipment. <br />It Andl be the responsibility ortheNsiomerto determine that all electrical equipment to bocontrolled is in good tvindrond <br />worLing condition. 11te Company will not be responsible for the repair, mpstttenance or replacement of the Co"orner's <br />electrical equipment. <br />41 TheCompanyis not requilredto install loud control <br />S. Billing under this schedule will commence after tile installation, inspection and wutcoqfiil testing of the load control <br />equipment. <br />6. Idanatcrianct- ofgenesittion equipincuturoosury Awthounplementation ofloadcon"t will irotbescheduled during Period r <br />where die Company projects that it would net be able to withstand the loss ofita largest unit and continue to serve firm <br />CONVISWITY Of SFRVI('f PROVISION: <br />In order to minimize the freqmcnoy and duration of inviruptions or requests that the Customer operate its backup generation <br />equipment, the Compauy will attempt it, obtain reasonably available additional capacity saillorentrgy during period$ for which <br />interruptions or "Iteration of the Customer's backup generation equipment may be requested. The Companys obligation in this <br />regard is, no diffkrctit than its obligation in general to poxchatm power to serve its Customers during a cupscity shortage, in other <br />words, the Company is notobligated to account fur, or otherwise reflect in its generation planning and construction, the possibility <br />of providing cgpielity and/or energy under this Continuity of!lstvice Provision. Any non-firm customets to electing to receive <br />uspatity, andlorenergy which enable(F) theCompany to colilinueserviceto theVuslomer's non-firm loadsduringtheI;II, periods will <br />besubjectto the additional charges set forth below, <br />(Continued on Sheet No, &659) <br />Issued I�Y: Ti 1'rany C01ii-ii, F wcuti N c DirvAor, Ru te M -i clopitient,& Strakg), <br />Effective, <br />