My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
2023-046A
CBCC
>
Official Documents
>
2020's
>
2023
>
2023-046A
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/9/2023 12:57:11 PM
Creation date
3/9/2023 12:51:48 PM
Metadata
Fields
Template:
Official Documents
Official Document Type
Change Order
Approved Date
02/21/2023
Control Number
2023-046A
Agenda Item Number
8.S.
Entity Name
Centerline, Inc.
Subject
Change Order #2 for North County Water & Sewer System Phase 2.
Project Number
1422-2
Bid Number
2021019
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
2
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
WORK CHANGE DIRECTIVE No. 9 <br />PROJECT: North Countv Water & Sewer System Phase 2 <br />DATE OF ISSUANCE: 1/10/2023 <br />OWNER: Indian River County Utilities 1801 27th Street Vero Beach, FL 32960 <br />CONTRACTOR: Centerline OWNER's Project No.: UCP #3556. <br />ENGINEER: Masteller & Moler, Inc. <br />EFFECTIVE DATE: 12/28/2022 ENGINEER's Project No.: 1422-2 <br />You are directed to proceed with the following change(s): <br />Description: Asphalt restoration overrun due to ROW Permit Conditions following project bidding <br />Attachment(s) (list documents supporting change): See Exhibit A attached. <br />If a claim is made that the above change(s) have affected Contract Price or Contract Time, any claim <br />for a Change Order based thereon will involve one of the following methods of determining the effect <br />of the change(s). <br />Method of determining change in Contract Price: <br />[ ] Time and Materials <br />[X] Unit Prices <br />[ ] Cost plus fixed fee <br />Estimated increase (decrease) in Contract Price <br />$ 260,866.00 <br />If the change involves an increase, the estimated <br />amount is not to be exceeded without further <br />authorization. <br />Method of determining change in Contract Time: <br />[X] Contractor's records <br />[ ] Engineer's records <br />[ ] Other <br />Estimated increase (decrease) in Contract Time <br />0 days. If the change involves an <br />increase, the estimated time is not to be exceeded <br />without further authorization. <br />Once the Work covered by the directive is completed or final cost and time determined, Contractor <br />should submit documentation for inclusion in a Change Order. <br />THIS IS A DIRECTIVE TO PROCEED WITH A CHANGE THAT MAY AFFECT THE CONTRACT <br />PRICE OR THE CONTRACT TIME. A CHANGE ORDER, IF ANY, SHOULD BE CONSIDERED <br />PROMPTLY. <br />RECOMMENDED: Masteller & Moler Inc. APPROVED: Indian River County <br />go <br />co�i;y; • <br />............ sL%/o <br />Engineer finer <br />Date: 1/10/2023 <br />ACCEPTED: Centerline, Inc. <br />Date: <br />Digitally signed by <br />Spencer Weiner <br />Date: 0 <br />CENTERLINE 14:3:01-05-00' <br />Date: <br />Contractor <br />BY � <br />10 V2020' ° <br />Attest: Jeffrey R. Smith, Clerk of <br />Circuit Court and Comptroller <br />
The URL can be used to link to this page
Your browser does not support the video tag.