My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
3/26/1996
CBCC
>
Meetings
>
1990's
>
1996
>
3/26/1996
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
7/23/2015 12:05:49 PM
Creation date
6/16/2015 3:24:26 PM
Metadata
Fields
Template:
Meetings
Meeting Type
Regular Meeting
Document Type
Minutes
Meeting Date
03/26/1996
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
47
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
PF",_ <br />mov 97 PAG 711. <br />Proposed 16 -inch water main will run on Indian River Boulevard from <br />8th Street north to an existing Master -planned line from Indian <br />River Apartments and a 12 -inch line on 8th Street running west to <br />an existing 12 -inch line. <br />The 16 -inch water main routing east of the residential development <br />along Indian River Boulevard and the 12 -inch line on 8th Street is <br />entirely Master -planned. As such, the developer will be reimbursed <br />the total amount for engineering and construction. The portion of <br />the water main that runs past the community will be charged to the <br />development at $11.25 per front foot as a line extension charge. <br />In addition to the water main extension, one of the County lift <br />stations must be upgraded as well. This is due to pressure head <br />changes that will be occurring in our system as a result of the <br />South County Wastewater Treatment Plant being upgraded and our <br />collection system is being put on line to the South County in lieu <br />of the City of Vero Beach. Therefore, the County is proposing to <br />pay for this upgrade through the developer's agreement. <br />ANALYSIS <br />The attached cost estimates and project reimbursement summary ill, <br />the developer's agreement describe the proposed reimbursement <br />schedule based on the applicable Master Plan sizing and lift <br />station upgrade. The construction of this system will assist the <br />County in expanding the water and sewer systems as outlined in the <br />County Master Plan, as well as allow the owner's property to be <br />developed. The total estimated project cost is -$304,425.00, <br />$297,730.80 of which will be paid by the County from the impact fee <br />fund. The remaining $6,694.20 of the estimated project cost will <br />be funded by the developer. (See attached developer's agreement <br />for details of the project cost.) The subdivision has purchased <br />200 ERUs of water and sewer for the project. <br />RECOMMENDATION <br />The staff of the Department of Utility Services recommends that the <br />Board of County Commissioners approve the developer's agreement as <br />presented. <br />ON MOTION by Commissioner Eggert, SECONDED by <br />Commissioner Bird, the Board unanimously approved <br />the developer's agreement with CCA Holdings, Ltd., <br />as recommended by staff. <br />AGREEMENT IS ON FILE IN THE OFFICE OF THE CLERK TO THE BOARD <br />34 <br />MARCH 26, 1996 <br />
The URL can be used to link to this page
Your browser does not support the video tag.