Laserfiche WebLink
K 41D <br />40 <br />o• <br />P <br />FLORIDA vZPA]=NMNT OF NATURAL RESOURCES <br />DIVISION OF BEACHES AND SHORES <br />"PLICATION IOR FUNDS UNDER PROVISIONS OF <br />CHAPTER 161.091, FLORIDA SxATQTL.4 <br />EROSION CONTROL PROGPM <br />Project Proposal - Part Iv: Required Stipulations <br />ror an erosion control project to qualify for funding, the project sponsor must <br />provide assurances that the applicant recognizes and agrees that its responsi- <br />bilities pertaining to the project are as follows; <br />I. The applicant will to the extent provided by law hold and save the State of <br />Florida, its agencies, officers and employees harmless from any and all <br />liabilities 41ich racy result from the construction or operation of this <br />project. <br />2. Select a project engineer on a competitive negotiation basis as outlined in. <br />Chapter 287, Florida Statutes. If applicant elects to use a private <br />engineering firm, any engineer used for design of this project either public <br />or private sn:st be registered in the State of Florida, <br />3. Contribute in cash or in-kind service the local share of the project <br />construction cost or study cost and assume full responsibility for all. pro- <br />ject costs in excess of the State -Federal cost limitation. <br />4. Provide without cost to the State of Florida all necessary lands, easements <br />and rights-of-way required for the project. <br />5. Assure continued public ownership or continued public use of the shore upon <br />vhich the aaount of State participation is based, and its.administratj.on for. <br />public use during the economic life of the project. <br />6. Assure maintenance and repair, and local share of periodic beach nourishment <br />where applicable, during the useful life of the project as required to se <br />the projects intended purpose. rve <br />7. Maintain rc—_uired public access and vehicle parking spaces, open and <br />available to all on equal terns for the life of the project. <br />8. <br />mile pe arra..at �ubl_c _.._ess to Project areas at approxma telt' one-half ile intervals. (1/2 <br />iule <br />9. _ J..s .ed `.��2� "Depar�,an . i ^`g spaces necessary in the public interest as <br />10. Provide an Environmental I=pact Statement, if required by the Department. <br />11. Provi%e without cost to the State of Florida cost for engineering, supervision, <br />air,inistration and inspection, cost of all construction right -of -;ray, cost of <br />public access easements, cost of vehicle parking spaces, cost of all required <br />p_rrits, all costs of establishing an erosion control line _.^.d <br />in" an =nvf rorr..ental assess int and, when regpested ""` or prepar- <br />of preparing an Environnental Impact Statement. the Department, the cost <br />-5- <br />