My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
12/13/2022 (2)
CBCC
>
Meetings
>
2020's
>
2022
>
12/13/2022 (2)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/16/2023 12:17:21 PM
Creation date
3/16/2023 10:48:56 AM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
12/13/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
469
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Comprehensive Plan Capital Improvements Element <br />• 100 percent of Florida Inventory of School Houses (FISH) capacity for each public school <br />type (elementary, middle, and high). <br />➢ Solid Waste (Countywide) <br />2.2 tons per capita per year or 3.67 cubic yards per capita for permanent plus weighted <br />peak seasonal population per year <br />➢ Stormwater Management <br />• New drainage systems shall mitigate the impacts of a 25 year/24 hour design rainfall <br />event <br />• Minimum road crown elevation for existing roads shall be raised during <br />resurfacing/rebuilding to the flood elevation resulting from the 2 year/24 hour storm <br />event on local roads <br />• The center two lanes of rebuilt roads must be at or above flood levels resulting from a <br />10 year/24 hour storm event on Arterial and Collector roads <br />• All drainage basins will meet the following level -of -service standards: <br />• By 2000 - 2 year/24 hour storm event <br />• By 2005 - 5 year/24 hour storm event <br />• By 2010 - 10 year/24 hour storm event <br />➢ Transportation (Roadways) <br />Level -of -Service "D". during peak hour, peak season, and peak direction conditions on <br />all TRIP grant funded roads as well as all freeway, arterial, and collector roadways, with <br />the exception of the following two, which will operate at level of service `B" plus 20%: <br />• 27' Ave — South County Line to SR 60 <br />• 43d Ave - Oslo Road to 16''' Street <br />For SIS/Florida Intrastate Highway System roadways, level of service `B" is adopted <br />for rural areas, and level of service "C" is adopted for urban areas. <br />➢ Transit <br />One-hour headways shall be maintained on all fixed transit routes <br />Level -of -service standards are discussed in further detail in individual Comprehensive Plan Elements. <br />Asset-based level of service standards for impact fee calculation purposes are provided in the Impact <br />Fee Ordinance (Title X). <br />Capital Improvements Program <br />Community Development Department <br />Adopted December _, 2022, Ordinance 2022 - <br />Indian River County <br />25 <br />244 <br />
The URL can be used to link to this page
Your browser does not support the video tag.