Laserfiche WebLink
IRC -1505 <br />639-3-11 <br />ELECTRICAL SERVICE DISCONNECT (F & 1) (POLE) <br />EA <br />1 <br />$ 2,499.00 <br />$ 2,499.00 <br />641-2-12 <br />PRE -STRESSED CONCRETE POLE (F & 1) (TYPE P-11 <br />EA <br />1 <br />$ 2,719.50 <br />$ 2,719.50 <br />SERVICE POLE) <br />646-1-11 <br />ALUMINUM SIGNAL POLES (F & 1) (PEDESTAL) <br />EA <br />4 <br />$ 2,257.50 <br />$ 9,030.00 <br />649-21-10 <br />STEEL MAST ARM (F & 1) (WS -170) (SINGLE ARM) <br />EA <br />2 <br />$ 82,950.00 <br />$ 165,900.00 <br />(60') <br />649-21-15 <br />STEEL MAST ARM (F & 1) (WS -170) (SINGLE ARM) <br />EA <br />2 <br />$ 89,250.00 <br />$ 178,500.00 <br />(70') <br />650-1-14 <br />TRAFFIC SIGNAL (F & 1) (ALUMINUM) (3 -SECT) (1 <br />AS <br />8 <br />$ 1,722.00 <br />$ 13,776.00 <br />WAY) <br />650-1-16 <br />TRAFFIC SIGNAL (F & 1) (ALUMINUM) (4 -SECT) (1 <br />AS <br />4 <br />$ 2,472.75 <br />$ 9,891.00 <br />WAY) <br />653-1-11 <br />PEDESTRIAN SIGNAL (F & 1) (LED COUNTDOWN) <br />AS <br />4 <br />$ 924.00 <br />$ 3,696.00 <br />(1 WAY) <br />660-4-11 <br />VIDEO DETECTION SYSTEM (F & 1) (CABINET) <br />EA <br />8 <br />$ 7,491.75 <br />$ 59,934.00 <br />660-4-12 <br />VIDEO DETECTION SYSTEM (F & 1) (ABOVE <br />EA <br />4 <br />$ 11,586.75 <br />$ 46,347.00 <br />GROUND EQUIPMENT) <br />665-1-11 <br />PEDESTRIAN DETECTOR (PUSH BUTTON) (F & 1) <br />EA <br />4 <br />$ 220.50 <br />$ 882.00 <br />(STANDARD) <br />670-5-110 <br />TRAFFIC CONTROLLER ASSEMBLY (F & 1) (NEMA) <br />AS <br />1 <br />$ 50,610.00 <br />$ 50,610.00 <br />682-1-133 <br />CCTV CAMERA (F & 1) (DOME PTZ, NOW <br />EA <br />1 <br />$ 9,712.50 <br />$ 9,712.50 <br />PRESSURIZED) (IP, HIGH DEFINITION) <br />684-1-1 <br />MANAGED FIELD ETHERNET SWITCH, LAYER 2 <br />EA <br />1 <br />$ 6,825.00 <br />$ 6,825.00 <br />(F&1) <br />700-1-60 <br />SINGLE POST SIGN (REMOVE) <br />AS <br />2 <br />$ 131.25 <br />$ 262.50 <br />700-5-22 <br />INTERNALLY ILLUMINATED SIGN (F & 1) <br />EA <br />4 <br />$ 4,410.00 <br />$ 17,640.00 <br />(OVERHEAD) (12-18 SF) <br />715-5-31 <br />LUMINAIRE AND BRACKET ARM (F & 1) <br />EA <br />4 <br />$ 3,307.50 <br />$ 13,230.00 <br />$ 814,277.14 <br />Reason for Change Order: <br />The purpose of this Change Order is to provide the means to compensate the Contractor to construct <br />a new signalized intersection on 66th Avenue at 53rd Street. This scope of work was not included at <br />time of original bid. <br />Attachments: (List documents supporting change) <br />• Exhibit A: Signalization Plans 53rd Street and 66th Avenue Intersection (10 Pages) <br />• Exhibit B: Change Order 03 Back-up Documentation (2 Pages) <br />o Appendix A: Engineer's Estimate and Backup Documentation ( 20 pages) <br />o Appendix B: Contractor's Cost Submittal (4 pages) <br />PAGE 2 OF 3 244 <br />