Laserfiche WebLink
b(B <br />APPB� 1 � . <br />278 <br />HALLEY ENGINEERING CONTRACTORS, INC. <br />To: <br />Indian River County IRC 1505 66th Ave <br />Contact: Rick Shepherd <br />Phone: 772-521-5632 <br />Project Name: <br />53RD ST SIGNALIZATION <br />Item # <br />Item Description <br />Estimated Quantity Unit Unit Price <br />Total Price <br />101-1 <br />MOBILIZATION <br />1.00 LS <br />$65,680.00 <br />$65,680.00 <br />102-1 <br />MAINTENANCE OF TRAFFIC <br />1.00 LS <br />$16,249.00 <br />$16,249.00 <br />110-1-1 <br />CLEARING & GRUBBING <br />1.00 LS <br />$3,450.00 <br />$3,450.00 <br />630-2-11 <br />CONDUIT ( SIGNAL) ( F & I) UNDERGROUND <br />236.00 LF <br />$58.80 <br />$13,876.80 <br />630-2-12 <br />2" CONDUIT -SIGNALS ( F&I) UNDERPAVEMENT 1 RUN <br />220.00 LF <br />$58.80 <br />$12,936.00 <br />630-2-12 <br />2' CONDUIT -SIGNALS (F&I) UNDERPAVEMENT 5 RUNS <br />300.00 INT <br />$58.80 <br />$17,640.00 <br />630-2-12 <br />2" CONDUIT -SIGNALS (F&I) UNDERPAVEMENT 6 RUNS <br />150.00 EACH <br />$58.80 <br />$8,820.00 <br />632-7-1 <br />SIGNAL CABLE (F&I) <br />1.00 EACH <br />$17,325.00 <br />$17,325.00 <br />633-2-31 <br />FIBER OPYIC CONNECTION ( INSTALL) ( SPLICE) <br />1.00 AMBY <br />$55.34 <br />$55.34 <br />633-3-11 <br />FIBER OPTIC CONNECTION HARDWARE ( F& I) SPLICE ENCLOSURE <br />12.00 LF <br />$1,627.50 <br />$19,530.00 <br />633-3-15 <br />FIBER OPTIC CONNECTION HARDWARE ( F& I) ( PATCH PANEL <br />1.00 EACH <br />$1,811.25 <br />$1,811.25 <br />635-2.11 <br />PULL & SPLICE BOX ( F &I) ( SIGNAL) ( 13 X 24) <br />22.00 EACH <br />$1,680.00 <br />$36,960.00 <br />635-2-12 <br />PULL & SPLICE BOX ( F &I) ( SIGNAL) ( 24 X 36 ) <br />1.00 EACH <br />$2,630.25 <br />$2,630.25 <br />639-1-122 <br />ELECTRICAL POWER SOURCE ( F & I )M UNDERGROUND (M PURCHASE BY <br />1.00 AS <br />$3,843.00 <br />$3,843.00 <br />639-2-1 <br />ELECTRICAL SERVICE WIRE ( F & 1 ) <br />300.00 LF <br />$6.72 <br />$2,016.00 <br />639-3-11 <br />ELECTRICAL SERVICE DISCONNECT (F & I) POLE <br />1.00 EA <br />$2,499.00 <br />$2,499.00 <br />639-2-12 <br />PER -STRESSED CONCRETE POLE( F & I) TYPE P- 11 SERVICE POLE <br />1.00 EA <br />$2,719.50 <br />$2,719.50 <br />646-1-11 <br />ALUMINUM SIGNAL POLE (F& I) PEDESTAL <br />4.00 EA <br />$2,257.50 <br />$9,030.00 <br />649-21-10 <br />MAST ARM ( F & I) ( WS -170 ) ( SINGLE ARM) (60') <br />2.00 EA <br />$82,950.00 <br />$165,900.00 <br />649-21-15 <br />MAST ARM ( F & 1) (WS -170) ( SINGLE ARM )(70 <br />2.00 EA <br />$89,250.00 <br />$178,500.00 <br />650-1-14 <br />TRAFFIC SIGNAL ( F & I) ALUMINIUM ( 3 -SECTION) 1 WAY) <br />ME <br />8.00 AS <br />$1,722.00 <br />$13,776.00 <br />650-1-16 <br />TRAFFIC SIGNAL ( F & I) ALUMINIUM ( 4-SECTIDII) ) <br />4.00 AS <br />$2,472.75 <br />$9,891.00 <br />653-1-11 <br />PEDDESTRIAN SIGNAL ( F & I ) LED COUNTDOWN:(1 .) . - : <br />4.00 AS <br />$924.00 <br />$3,696.00 <br />660-4-11 <br />VIDEO DETECTION SYSTEM ( F& I) CABINET <br />8.00 EA <br />$7,491.75 <br />$59,934.00 <br />660-4-12 <br />VIDEO DETECTION SYSTEM ( F & I) <br />- 4.00 EA <br />$11,586.75 <br />$46,347.00 <br />665-1-11 <br />PEDESTRIAN DETECTOR( PUSH BUTTON ) F& ISTANDARD <br />4.00 EA <br />$220.50 <br />$882.00 <br />670-5-110 <br />TRAFFIC CONTROL ASSEMBLY ( F & I ) NEMA <br />1.00 AS <br />$50,610.00 <br />$50,610.00 <br />682-2-133 <br />O CAMERA ( F & I) ( DOME PTZ, NON -PRESSURIZED) ( IP, HIGH DEFIN <br />100 EA <br />$9,712.50 <br />$9,712.50 <br />6641-1 <br />MANAGED FIELD ENTHERNET SWITCH LAYER 2 ( F & I) <br />1.00 EA <br />$6,825.00 <br />$6,825.00 <br />700-1-60 <br />SINGLE POST SIGN ( REMOVE) <br />2.00 AS <br />$131.25 <br />$262.50 <br />700-5-22 <br />INTERNALLY ILLUNMINATED SIGN ( F & I) OVERHEAD ( 12-18 SF) <br />4.00 EA <br />$4,410.00 <br />$17,640.00 <br />715-5-31 <br />LUMINAIRE AND BRACKET ARM ( F& I) <br />4.00 EA <br />$3,307.50 <br />$13,230.00 <br />TOTAL BID PRICE <br />$814,277.14 <br />Notes: <br />• Our proposal is valid for 30 days following the date of bid submission. Exceptions may be granted upon written request. <br />' Local power company impact fees & permit fees are not included. <br />• Preparation of shop drawings and submittals generally take 30-45 days following the issuance of a notice to proceed under usual circumstances. <br />• A reasonable material procurement is anticpated thereafter (22-28 weeks) <br />• Proposal does NOT include any cast associated with de -energizing electrical lines for installation of drill shaft foundations and Mastarms, if needed. <br />ACCEPTED: <br />The above prices, specifications and conditions are satisfactory and are hereby accepted. <br />Buyer: <br />Signature: <br />Date of <br />Acceptance: <br />278 <br />