Laserfiche WebLink
M <br />SECTION XVIII <br />Prior to the Corporation placing any of its facilities <br />in any of the public places as herein authorized, the Corporation <br />shall make application to and obtain a permit from the County <br />Engineer authorizing said construction in the same manner as <br />permits are authorized in the County for the use of the public <br />roads as shall now or hereafter be established by regulations of <br />the County. The County shall have the right when special circum- <br />stances exist to determine the time in which such construction <br />shall be done. <br />CW"PTnAl vTv <br />If the Corporation fails or refuses to promptly and <br />faithfully keep, perform and abide by the terms and conditions of <br />this franchise, then the Board shall give the Corporation written <br />notice of such deficiencies or defaults and a reasonable time <br />within which the Corporation shall remedy the same, which notice <br />shall specify the deficiency or default. If the Corporation fails <br />to remedy such deficiency or default within the time required by <br />the notice from the Board, the Board may thereafter schedule a <br />hearing concerning the same with reasonable notice thereof to the <br />Corporation, and after such hearing at which all interested <br />parties shall be heard, the Board may levy liquidated damages of <br />$50.00 per day that said deficiency or default exists from the <br />date of said hearing held by the Board; and the Board may further <br />limit or restrict this franchise or may terminate and cancel the <br />same in whole or in part if proper reasons thereby are found by <br />the Board. If the Board enters an order pursuant to such hearing <br />and the Corporation or any other person feels aggrieved by such <br />order, the utility or such other person may seek review of the <br />Board's action by proceedings in the Circuit Court of the County. <br />SECTION XX <br />County shall have the right, but not the duty to make <br />necessary inspections during construction and quarterly thereafter <br />at the cost of TWENTY ($20.00) DOLLARS per unit as covered by the <br />permit fee herein to be paid by the Corporation. The utility or <br />corporation, as the case may be, shall pay the said inspection fee <br />-12- <br />