Laserfiche WebLink
0 <br />ALL PAVING: <br />First 1,000 square feet 7.00 <br />Each 1,000 square feet or fraction <br />thereof to 10,000 square feet 2.50 <br />Each 1,000 square feet or fraction <br />thereof 1.50 <br />MOVING BUILDINGS OR STRUCTURES: <br />Each alteration thereto/Building Permit <br />Fees 50.00 <br />PLAN CHECKING FEES: <br />When the vnlnatinn of the N �d construction exu eels $i,000.00 <br />rv pv - sc_ <br />and a plan is required to be submitted by Section 105.3 of the <br />Standard Building Code, a plan checking fee shall be paid to the <br />building official at the time of submitting plans and <br />specifications for checking. Said plan checking fee shall be <br />one-half of the building permit fee as set forth in this <br />resolution. <br />Where work for which a permit is required by the Standard Building <br />Code is started, or proceeded with prior to obtaining said permit, <br />the fee herein shall be doubled, but payment of said double fee <br />shall not relieve any persons from fully complying with the <br />requirements of applicable County ordinances in the execution of <br />the work. Nor shall the payment of a double fee relieve any <br />persons from penalties as defined elsewhere in the ordinances of <br />Indian River County. <br />A re -infection fee, in the amount of $6.00, shall be charged for <br />each trip in cases where: <br />(a) Previous repairs or corrections were not satisfactorily and <br />properly made prior to such inspection. <br />(b) The work was not ready when the inspector was requested. <br />(c) Wrong address or improper directions were given for <br />location <br />of the property. <br />Before additional permits will be issued, payment must be <br />made for <br />re -inspection. <br />INSULATION: <br />See Building Permit Fees on valuation (New construction, <br />repairs <br />and alterations). <br />PLUMBING FEES <br />When an application for permit is approved and <br />before a <br />permit is issued, a fee therefore shall be paid based on <br />the <br />following schedule of rates: <br />FEE <br />(a) For each fixture roughed in and <br />installed on new or reconstructed <br />plumbing, or each fixture outlet <br />roughed in $ 2.75 <br />(b) For each water heater 2.75 <br />(c) For each septic tank to 1,200 gallons 5.00 <br />For each septic tank over 1,200 gallons 6.00 <br />(d) For each grease trap 4.00 <br />(e) For each sewer connection 6.00 <br />(f) For inspection of remodeling or repairs <br />on waste „o-1 , vent, drain or s ewor <br />pipes 6.00 <br />-3- <br />