My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1982-139
CBCC
>
Resolutions
>
1980'S
>
1982
>
1982-139
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/20/2023 11:06:17 AM
Creation date
3/20/2023 11:06:09 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1982-139
Approved Date
12/15/1982
Subject
Revising the Schedule of Building Permit Fees & Charges
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
8
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
does not conform to and comply with the <br />requirements established by the County, <br />he shall notify the master electrician, indicating <br />the corrections required; and when the inspector <br />is notified that the corrections have been made, <br />he will again inspect the work or apparatus <br />without further charge; but, when extra <br />inspection trips are necessary, due to any of <br />the following reasons, a charge of. $8.00 shall <br />be made for each trip - payable prior to <br />reinspection. 8.00 <br />(aa) Wrona address <br />(bb) Condemned work, resulting from <br />faulty construction <br />(cc) Repairs or corrections not <br />made when inspection is called <br />(dd) Work not ready for inspection <br />when called. <br />The payment of re -inspection fee shall be made before <br />any further permits will be issued to the person owing same. <br />WORK STARTED BEFORE PERMIT IS ISSUED - THE FEE SHALL BE DOUBLED <br />MECHANICAL FEES <br />When applicant for permit is approved and before a <br />permit is issued, a fee therefore shall be paid based on the <br />following schedule of rates. <br />FEE <br />*AIR CONDITIONING AND REFRIGERATION: <br />For the purpose of charging fees - 1 ton <br />of refrigeration will equal 12,000 <br />B.T.U.'s/hour or 1 H.P. total connected <br />load. <br />The first 5 tons or fractional part $ 8.00 <br />The next 5 tons up to and including <br />10 tons - per ton 1.50 <br />Over 10 tons - per ton additional 2.00 <br />All major repairs or replacements, <br />same fees as above. <br />WINDOW UNITS OR WALL UNITS: (Where no <br />construction work is involved in the <br />building or duct work attached) <br />For the first 5 units - each 3.50 <br />For each additional unit 2.00 <br />WORK STARTED BEFORE A PERMIT IS ISSUED - THE FEE SHALL BE DOUBLED <br />* MECHANICAL PERMIT FEE - See Plumbing <br />Permit Fees for Furnaces and Heating Equipment. <br />TRAILER PARK FEE SCHEDULE - AUGUST, 1976 REVISION <br />INDIVIDUAL TRAILERS - OTHER ALUMINUM WORK <br />FEE <br />Tie -down Permit $ 8.00 <br />Carport Roof - Screen Room <br />(To be charged by cubic area - <br />Residential) <br />Utility stnra__ge is included tided i n <br />carport roof permit <br />Patio Slab (No Cover) 7.00 <br />-7- <br />
The URL can be used to link to this page
Your browser does not support the video tag.