My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-044
CBCC
>
Resolutions
>
1980'S
>
1983
>
1983-044
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/23/2023 10:50:20 AM
Creation date
3/23/2023 10:49:59 AM
Metadata
Fields
Template:
Resolutions
Resolution Number
1983-044
Approved Date
06/15/1983
Subject
Tamara Gardens Water System Franchise
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
20
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
of the project as shown on the plans submitted. The Utility shall <br />cause said certification to be submitted to the County along with <br />the Florida Department of. Environmental Regulation applications <br />and plans, for County review. Submission to the County for review <br />may occur simultaneously with submission of said documents to the <br />Florida Department of Environmental Regulation. Upon approval by <br />the County of the plant and system, a permit shall be issued to <br />the Utility for the construction thereof. <br />Upon the completion of all construction of the water <br />treatment plant and distribution system, the project engineer for <br />the Utility shall certify, under seal, that the system has been <br />constructed substantially in accordance with the plans and <br />specifications previously approved and that the systems meet all <br />of the standards required by ,.he County. The certification shall <br />include submission to the County of two sets of "as -built' <br />drawings, consisting of one set in reproducible vellums and one <br />set of regular blueline prints; and that the systems meet all of <br />the standards required by the County, including pressure and <br />leakage tests, chlorination and bacteriological tests, <br />infiltration and exfiltration tests. Upon receipt of <br />certification from the engineer, the County will issue a letter <br />acknowledging the construction of the water systems. No service <br />is to be provided to customers until such time as the County <br />issues a letter of acknowledgment. The issuance of said letter <br />shall not be unreasonably withheld. The Utility shall grant <br />necessary easements to County without charge to connect the water <br />system to the County Master Water System together with such <br />easements as are necessary to provide access to the water system, <br />where and if the County makes water service available to the <br />project. The Utility shall pay a $1,000.00 franchise application <br />fee at the time of the submission of the franchise resolution, and <br />agrees to pay all other fees which may be applicable during the <br />operation of the system. <br />All of the facilities of the Utility shall be constructed in <br />accordance with the plans and specifications approved by the <br />Department of Environmental Regulation of the State of Florida and <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.