Laserfiche WebLink
«reply with the above standards. prior to the issuance of a <br />construction perm t$ the Utility's project engineers shall certify to <br />the County that the design standards as ret forth in said "Ccnstevction <br />Specifications" of Indian River Utilities Department, July, 1990, or as <br />amended, will be met by completion of the project as sham on the plans <br />submitted. The Utility shall cause said certification to be submitted <br />to the Cau:ty along with the Florida Department of Eav£ro:mental <br />Regulation applications and plans, for County review. Submission bo the <br />county for review nay occur sivultaneaysly with submission of said <br />doaments to the Florida Department of Fhviroarental Regulation. Upon <br />approval by the County of the plant and system, a permit shall be issued <br />to the Utility for the construction thereof. <br />Prior be the issuance of a construction permit, certificatim from <br />the Indian River County Fire Department must be obtained certifying fire <br />flow requirements have been net. <br />Upon the completion of all construction of the water and wastewater <br />treatment plants and distribution and o'"llectien systems, the project <br />engineer for the Utility shall certify, under seal, that the system has <br />been constructed substantially in accordance with the plans and <br />specifications previvaly approved and that the systers meet all of the <br />standards required by the County. The certification shall include <br />submission to the County of two sets of "as -built" (as defined by the <br />Canty) drawings, consisting of one set in reproducible vellums and one <br />set of regular blueline prints; and that the systems most all of the <br />standards required by the County, including pressure and leakage tests, <br />chlorination and bacteriological tests, infiltration and exfiltration <br />tests. Upon receipt of certification from the engineer, the County will <br />issue a letter acknowledging the construction of the water and/or <br />wastewater systems. No service is to be provided to customers until <br />such time as the Canty issues a letter of acknowledgment. The issuance <br />of said letter shall not be unreasonable withheld. The Utility shall <br />grant necessary easements to the County without charge to cameo the <br />water and/or wastewater system be the Canty Master Water and/or <br />Wastewater System together with such easements as are necessary to <br />provide access be the water and/or wastewater system, where and if the <br />County makes water and/or wastewater service available to the project. <br />The Utility shall Fay a one thousand dollar ($1,000) franchise <br />application fee at the time of the submission of the franchise <br />application, and agrees to pay all other fees which Wray be applicable <br />during the operation of the system. <br />sWrION VII <br />=IFICATICN OF OPERATIONS MD MIRTFNANCE <br />All of the facilities of the Utility shall be constructed in <br />accordance with the plans and specifications approved by the Department <br />of Environmental Regulation of the State of Florida and Indian River <br />County Utilities Department. The manner of treatment and distribution <br />of water and the manner of collection and disposal of wastewater shall <br />