My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-107
CBCC
>
Resolutions
>
1980'S
>
1983
>
1983-107
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 12:01:05 PM
Creation date
3/30/2023 11:48:38 AM
Metadata
Fields
Template:
Resolutions
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
37
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
, <br />4� <br />40 <br />costs of distribution and treatment facilities; and second, their degree <br />of treatment sophistication as prescribed by the Department of <br />Environmental Regulation or body having jurisdiction over the matter. <br />Without County approval, the schedule of connection charges set forth <br />do herein may be escalated based upon increases in utility construction <br />costs as evidenced by the quarterly construction .index published in <br />Engineering_New Record Ma azi_ne, "Construction Cost Index, 20 Cities". <br />Utility shall adjust the connection charges set forth herein <br />semi-annually, with the first such adjustment to be not earlier than <br />January I, 1984. Any escalution shall not exceed the percentage <br />• difference between said construction cast index for the base period <br />ending September 30, 1981, as compared with the period of comparison. <br />Escrow charges and fees as contain in Section 14V below shall be included <br />in the respective connection charges listed above and incorporated <br />therein. <br />RFY`VT(W X[IT <br />.Escrow Charges <br />The Utility agrees to pay a fee in the amount of the currently <br />imposed contribution in aid of construction for each unit in effect at <br />the time of the issuance of a certificate of occupancy, as a <br />contribution in aid, of construction charge (for future connection to <br />County water distribution mains or wastewater collection systems) as <br />provided for in ordinance 80-21, Section 3, Part B. Utility further <br />agrees to pay a sum per ERC for water and wastewater plant capacity <br />10 <br />FRANCHISE EU, <br />The Utility hereby agrees to pay to the County a franchise fee in <br />the amount of six percent (6%) of the Utility's annual gross receipts, <br />(or the sum of five hundred dollars ($500) , whichever is greater), <br />derived frau monthly service charges to defray the cost of regulation <br />and for use of County rights-of-way and public places. The Utility <br />shall pay the 6% franchise fee quarterly. Said fee shall be shown as a <br />separate additional charge on utility bills.. <br />The Utility shall supply the County with a copy of the Utility's <br />annual report and financial statements. All records and all accounting <br />of Utility shall be in accordance with the Uniform System of Accounts of <br />the National Association of Regulatory Utilities co mnissioners and <br />general accepted accounting principles. Within ninety (90) days after <br />close of fiscal year, the Utility shall submit financial statements <br />prepared by a CPA and in accordance with general accepting accounting <br />standards and NARUC. Upon demand by the hoard the Utility will submit <br />audited financial state =ts certified by a CPA. Also, a letter from a <br />CPA certifying that the six percent (6%) franchise fee and the two and <br />one-half percent (2�%) renewal and replacement account has been <br />collected and disbursed in accordance with the tem s of this Agreement. <br />RFY`VT(W X[IT <br />.Escrow Charges <br />The Utility agrees to pay a fee in the amount of the currently <br />imposed contribution in aid of construction for each unit in effect at <br />the time of the issuance of a certificate of occupancy, as a <br />contribution in aid, of construction charge (for future connection to <br />County water distribution mains or wastewater collection systems) as <br />provided for in ordinance 80-21, Section 3, Part B. Utility further <br />agrees to pay a sum per ERC for water and wastewater plant capacity <br />10 <br />
The URL can be used to link to this page
Your browser does not support the video tag.