My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
1983-120
CBCC
>
Resolutions
>
1980'S
>
1983
>
1983-120
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
3/30/2023 12:21:26 PM
Creation date
3/30/2023 12:20:59 PM
Metadata
Fields
Template:
Resolutions
Resolution Number
1983-120
Approved Date
12/07/1983
Subject
Known as the "Pine Creek Water & Wastewater System Franchise"
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
19
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
40 <br />•4 <br />and regulations as are or may be set forth by the Board fran time to <br />time, which shall include but not be limited to "Construction <br />Specification for Water Treatment/Distribution and Sewage <br />Treatment/Collection Facilities" promulgated by Indian River County <br />Utilities Department, July 1980, or as amended. The County shall <br />require the Utility to comply with the above standards. Prior to the <br />issuance of a construction permit, the Utility's project engineers shall <br />certify to the County that the design standards as set forth in said <br />"Construction Specifications" of Indian River Utilities Department, <br />July, 1980, or as amended, will be met by completion of the project as <br />shown on the plans submitted. The Utility shall cause said <br />certification to be submitted to the County along with the Florida <br />Depart=ment of Environmental Regulation applications and plans, for <br />County review. Submission to the county for review may occur <br />simultaneously with submission of said documents to the Florida <br />Department of Environmental Regulation. Upon approval by the county of <br />the plant and system, a permit shall be issued to the Utility for the <br />construction thereof. <br />Prior to the issuance of a construction permit, certification from <br />the Indian River County Fire Department moist be obtained certifying fire <br />flow requirements have been met. <br />Upon the completion of all construction of the water and wastewater <br />treatment plants and distribution and collection systems, the project <br />engineer for the Utility shall certify, under seal, that the system has <br />been constructed substantially in accordance with the plans and <br />specifications previously approved and that the systems meet all of the <br />standards required by the County. The certification shall include <br />submission to the County of two sets of "as-built"(as defined by the <br />County) drawings, consisting of one set in reproducible vellums and one <br />set of regular blueline prints; and that the systems meet all of the <br />standards required by the County, including pressure and leakage tests, <br />chlorination and bacteriological tests, infiltration and exfiltration <br />tests. Upon receipt of certification from the engineer, the County will <br />issue a letter acknowledging the construction of the water and <br />wastewater systems. No service is to be provided to customers until <br />such time as the County issues a letter of acknowledgment. The issuance <br />of said letter shall not be unreasonable withheld. The Utility shall <br />grant necessary easements to the County without charge to connect the <br />water and/or wastewater system to the County Master Water and/or <br />Wastewater System together with such easements as are necessary to <br />provide access to the water and/or wastewater system, where and if the <br />County makes water and/or wastewater service available to the project. <br />The Utility shall pay a one thousand dollar ($1,000) franchise <br />application fee at the time of the submission of the franchise <br />application, and agrees to pay all other fees which may be applicable <br />during the operation of the system. <br />4 <br />
The URL can be used to link to this page
Your browser does not support the video tag.