Laserfiche WebLink
Main Inspections Piplei " <br />Project name: Mainline Id: tom: AfteWt <br />, <br />ROUTE 60 AND 41ST AVE S-4 TO S-5 VERO BEACH FL <br />Start data/ftnte.• Dinedlon: Weather ;GOtic�t%rls. <br />4rl2rA 2 8:55 AAA With dw now Dry <br />Pipe shape. Pipe t'nateriai: Pipe.tftht: Pipeoft: <br />Cinwhr Concrete Reinforced sto het. ti4A. An. <br />AF -11 <br />Stopped at 0.1 ft. with flow <br />on 4/22/2022 9:57:43 AM <br />Started at 2.0 ft. with flow— <br />on 4/22/2022 9:55:00 AM <br />Started at 2.0 ft. with flow — <br />on 4/22/2022 10:013:30 AM '+ <br />0.8 k. <br />Catch Basln'S-5' <br />Sonne observations have distance greater than the pipe length <br />z;o h <br />Main Inspections Pipe Run Page 20 of 22 <br />218 <br />