My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/2022 (3)
CBCC
>
Meetings
>
2020's
>
2022
>
11/15/2022 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 2:44:32 PM
Creation date
4/4/2023 1:03:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/15/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
Equipment on site: TIMOTHY ROSE CONTRACTING (PRIME); <br />1 -Chevrolet 4X4 Denali Pickup Truck <br />ASWD (SUB); <br />1 -Vac Truck <br />1-F550 Box Truck (Video Truck) <br />Hand tools <br />URETEK (SUB); <br />1 -Chevrolet Z71 Pickup Truck <br />1-F250 4X4 Pickup Truck <br />1-17550 Flatbed Truck <br />1 -Tractor Trailer <br />1 -Generator <br />2 -Drills <br />Hand Tools <br />Summary of Work: TIMOTHY ROSE CONTRACTING (PRIME); <br />Form Created <br />07.20.2022 07:41 am <br />Comment <br />08.09.2022 10:32am <br />To: Matt Kirkland <br />CC: <br />By: Matt Kirkland <br />CC: <br />Form closed and placed back in the author's court. <br />243 <br />MOT (No ACTIVITY #)- <br />1) Set up and remove WB S.R.# 60 Left turn lane and EB S.R.# 60 Right turn with <br />Road Closed on 39th Ave. <br />ASWD (SUB); <br />DESILTING & VIDEO (No ACTIVITY #); <br />1) Begin desilting with Vac truck prior to Videoing existing 54" RCP on RT (R3) <br />roadway of S.R.# 60 @ S-7 to S-4 @ Station # 2656+25 - 2659+67 RT. <br />URETEK (SUB); <br />POLYURETHANE INJECTION (No Activity #); <br />1) Begin preparing and cutting 4', 8'& 12' rods for Polyurethane injection on RT (R3) <br />roadway of S.R.# 60 @ GPR location #1 @ Station # 2658+51 - 2656+35 RT (216'). <br />2) Begin layout outside of located AT&T duct bank for 4', 8' and 12' rods to be drilled <br />every 4' on center and on north & south side of existing 54" RCP starting at Station # <br />2658+51 - 2657+50 RT. <br />3) Begin drilling holes for 4', 8'& 12' rods every 4' on center and on north & south side <br />of existing 54" RCP starting at Station # 2658+51 - 2657+50 RT. <br />Safety Issues: <br />N/A <br />Other <br />Observations: <br />N/A <br />Jobsite Photo: <br />7-18-22 MOT (3).JPG <br />Visitors/Company: <br />Locater located AT&T Duct Bank on S.R.#60 @ 39th Ave prior to drilling holes for <br />rods. <br />HOURS AT <br />JOBSITE: <br />7:OOa.m. - 4:30p.m. (9.OHrs.) <br />Form Created <br />07.20.2022 07:41 am <br />Comment <br />08.09.2022 10:32am <br />To: Matt Kirkland <br />CC: <br />By: Matt Kirkland <br />CC: <br />Form closed and placed back in the author's court. <br />243 <br />
The URL can be used to link to this page
Your browser does not support the video tag.