My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/2022 (3)
CBCC
>
Meetings
>
2020's
>
2022
>
11/15/2022 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 2:44:32 PM
Creation date
4/4/2023 1:03:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/15/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 -Vac Truck <br />1-17550 Box Truck (Video Truck) <br />Hand tools <br />URETEK (SUB); <br />1-17250 4X4 Pickup Truck <br />1-17550 Flatbed Truck <br />1 -Tractor Trailer <br />1 -Generator <br />1 -Fork Lift <br />2 -Spray Guns <br />Hand Tools <br />Summary of Work: TIMOTHY ROSE CONTRACTING (PRIME); <br />Form Created <br />07.21.2022 07:49am <br />Comment <br />To: Matt Kirkland <br />CC: <br />By: Matt Kirkland <br />253 <br />MOT (No ACTIVITY #); <br />1) Continue to set up and remove WB S.R.# 60 Left tum lane and EB S.R.# 60 Right <br />turn with Road Closed on 39th Ave. <br />ASWD (SUB); <br />DESILTING & VIDEO (No ACTIVITY #); <br />1) Continue desilting with Vac truck prior to Videoing existing 54" RCP during <br />Polyurethane Injection on RT (R3) roadway/sidewalk of S.R.# 60 @ S-7 to S-4 @ <br />Station # 2656+25 - 2659+67 RT. <br />2) Continue videoing existing 54" RCP during Polyurethane injection operation for <br />leaks and blow outs @ Station # 2657+83 - 2657+35 RT. <br />3) Had blow out @ S-5 which was cleaned out of pipe. <br />URETEK (SUB); <br />POLYURETHANE INJECTION (No Activity #); <br />1) Continue preparing and cutting 4', 8' & 12' rods for Polyurethane injection on RT <br />(R3) roadway of S.R.# 60 @ GPR location #1 @ Station # 2658+51 - 2656+35 RT <br />(216'). <br />2) Begin drilling and installing for 4', 8' and 12' rods every 4' on center and on each <br />side of existing 54" RCP starting at Station # 2657+83 - 2657+35 RT. (48') <br />3) Begin injecting Polyurethane to a depth of 4', 8' and 12' through rods and took <br />meter readings after each required depth from Station # 2657+83 - 2657+35 RT for a <br />total of 48' which took 4,286.9276 lbs. for a total to date of 8,284.7742 lbs. <br />4) Filled holes by drill in asphalt with non -shrink grout. <br />Safety Issues: <br />N/A <br />Other <br />Observations: <br />N/A <br />Jobsite Photo: <br />7-20-22 Injecting Polyurethane (3).JPG <br />Visitors/Company: <br />AT&T on site again after pressurizing duct bank with helium over night and did not <br />sniff any leaks @ drilled holes. <br />HOURS AT <br />JOBSITE: <br />7:OOa.m. - 5:30p.m. (10.OHrs.) <br />Form Created <br />07.21.2022 07:49am <br />Comment <br />To: Matt Kirkland <br />CC: <br />By: Matt Kirkland <br />253 <br />
The URL can be used to link to this page
Your browser does not support the video tag.