My WebLink
|
Help
|
About
|
Sign Out
Home
Browse
Search
11/15/2022 (3)
CBCC
>
Meetings
>
2020's
>
2022
>
11/15/2022 (3)
Metadata
Thumbnails
Annotations
Entry Properties
Last modified
4/4/2023 2:44:32 PM
Creation date
4/4/2023 1:03:02 PM
Metadata
Fields
Template:
Meetings
Meeting Type
BCC Regular Meeting
Document Type
Agenda Packet
Meeting Date
11/15/2022
Meeting Body
Board of County Commissioners
Jump to thumbnail
< previous set
next set >
There are no annotations on this page.
Document management portal powered by Laserfiche WebLink 9 © 1998-2015
Laserfiche.
All rights reserved.
/
443
PDF
Print
Pages to print
Enter page numbers and/or page ranges separated by commas. For example, 1,3,5-12.
After downloading, print the document using a PDF reader (e.g. Adobe Reader).
View images
View plain text
1 -Vac Truck <br />1-F550 Box Truck (Video Truck) <br />Hand tools <br />URETEK (SUB); <br />1-17250 4X4 Pickup Truck <br />1 -Tractor Trailer <br />1 -Trailer <br />1 -Generator <br />1 -Fork Lift <br />2 -Spray Guns <br />Hand Tools <br />Summary of Work: TIMOTHY ROSE CONTRACTING (PRIME); <br />Form Created <br />07.27.2022 03:10pm <br />Comment <br />08.09.2022 10:29am <br />To: Matt Kirkland <br />CC: <br />By: Matt Kirkland <br />CC: <br />Form closed and placed back in the author's court. <br />273 <br />MOT (No ACTIVITY #); <br />1) Continue to set up and remove MOT lane closure on Eastbound S.R.# 60, between <br />41 st & 40th Ave. <br />ASWD (SUB); <br />DESILTING & VIDEO (No ACTIVITY #); <br />1) Continue desilting with Vac truck prior to Videoing existing 54" RCP during <br />Polyurethane Injection on RT (R3) roadway/sidewalk of S.R.# 60 @ S-10 to S-8 @ <br />Station # 2652+07 - 2652+74 RT (67'). <br />2) Continue videoing existing 54" RCP during Polyurethane injection operation for <br />leaks and blow outs @ Station # 2652+07 - 2652+74 RT (67'). <br />URETEK (SUB); <br />POLYURETHANE INJECTION (No Activity #); <br />1) Continue preparing and cutting 4', 8',12 & 16' rods for Polyurethane injection on RT <br />(R3) roadway of S.R.# 60 @ GPR location #2 @ Station # 2652+07 - 2652+74 RT <br />(67'). <br />2) Begin drilling and installing for 4', 8',12 and 16' rods every 4' on center and on each <br />side of existing 54" RCP starting at Station # 2652+74 - 2652+25 RT. (49') <br />3) Begin injecting Polyurethane to a depth of 4', 8',12 and 16' through rods and took <br />meter readings after each required depth from Station # 2652+74 - 2652+25 RT for a <br />total of 49' which took 2,999.6482 lbs. for a total to date of 19,411.817 lbs. <br />4) Filled holes left by drill in asphalt with non -shrink grout. <br />Safety Issues: <br />N/A <br />Other <br />Could not drill and inject polyurethane @ Station # 2652+45, 53' RT, due to Structure <br />Observations: <br />S-9. <br />Jobsite Photo: <br />7-25-22 Polyurethane Installation (2).JPG <br />Visitors/Company: <br />N/A <br />HOURS AT <br />JOBSITE: <br />7:OOa.m. - 4:00p.m. (8.5Hrs.) <br />Form Created <br />07.27.2022 03:10pm <br />Comment <br />08.09.2022 10:29am <br />To: Matt Kirkland <br />CC: <br />By: Matt Kirkland <br />CC: <br />Form closed and placed back in the author's court. <br />273 <br />
The URL can be used to link to this page
Your browser does not support the video tag.