Laserfiche WebLink
7/20/2020 3:34:44PM <br />QUOTE PROPOSAL <br />C.W. ROBERTS CONTRACTING, INC <br />rw- 806 NW 9th St <br />CONTRACTING, INC' Okeechobee, FL 34972 <br />Contact: Justin Andrews <br />Phone: 863-763-7373 <br />Fax: 863-763-7379 <br />Job Name; SR 60 & 43rd Ave <br />uote To: Timothy Rose Contracting, Inc. FPN: <br />1360 Old Dixie Highway SW, Suite 106 6/2017 <br />Date of Plans: <br />Vero Beach, Florida 32962 Revision Date. <br />Phone: 772-564-7800 <br />Fax: 772-564-7888 Ouote R n. <br />OUNT <br />DESCRIPTION QUANTITY UNIT UNIT PRICE AM 48 DD0.00 <br />ITEM I.00 LS 48,000.00 <br />100 MOBILIZATION155.00 15,190.00 <br />200 TURNOUT CONSTRUCTION- 98.00 TN 734,400.00 <br />ASPHALTIDRIVEWAY BASE -ASPHALT 7,200.00 TN 102.00 <br />300 SUPERPAVE ASPHALTIC CONC, TAFFIC C 578,340.00 <br />(OVERBUILD) 4,760.00 TN 121.50 <br />400 SUPERPAVE ASPHALTIC CONC, TRAFFIC C, 422,802.25 <br />PG 76-22, (SP 3,173.00 TN 133.25 <br />500 ASPHALT CONCRETE FRICTION COURSE, FC - <br />9.5, TRAFFIC $1,798,732.25 <br />GRAND TOTAL <br />NOTES' <br />1.)Temporary striping and removal is not included. <br />2.)Layout is not included. r C for the asphalt paving only. <br />3.)CWR has included roadway Q others. CWR is not reponsible for the integrity or <br />4.)Base to be compacted per specifications and left on plan grade by <br />imperfections of said base. <br />000 for each additional mobilization. <br />5.)Pricing is based on 6 mobilizations, add $2, <br />6.)Asphalt Overruns will be billed at the above unit prices. <br />7.)Bituminous Tack Coat is included in Asphalt prices. <br />8.)Bituminous Prime Coat is not included. <br />9.)Bond is not included. <br />10.)MOT setup and devices are not included. of(5/8!2020), Y <br />but may be accepted at any later date at the sole <br />11.)This proposal expires thirty (30) days from the date here <br />option of CWR. <br />Page 1 of 1 <br />